Executive Summary

This report will discuss the infrastructure management of the Storm Water Management and Road Tunnel (SMART) of Kuala Lumpur, Malaysia. This tunnel was built mainly to cater to the reoccurring flash floods that happened in the area, and to act as an alternate traffic route. It began construction in 2003 and was operational early 2007.

A structure of such magnitude required in-depth designing and precise construction methods to ensure that the structure would be able to fulfill its desired purposes. As such, the structure has indeed proved worthy of being able to not only provide a solution to the flash floods, but also act as an alternate route for traffic heading from and to the city.

An asset management plan is crucial in identifying important aspects of the structure. These include the current and desired performance of the structure, identifying maintenance issues, highlighting critical risks, analyzing factors as well as providing suggestions and non asset solutions to potential problems and predicaments.

The report will discuss in detail:

- asset management practices - level of services - stakeholder analysis - demand forecasts - factor sensitivity analysis - condition monitoring plans - risk analysis and management

1. Introduction

The Stormwater Management and Road Tunnel or SMART Tunnel is an incorporated infrastructure consists of a storm drainage and road structure in Kuala Lumpur, Malaysia. It is the longest stormwater tunnel in South East Asia and also the second longest in Asia. Besides that, it is a one of its kind dual-purpose tunnel project integrating stormwater and motorway. The main objective of this infrastructure is to solve flash floods problems in Kuala Lumpur as well as to reduce traffic jams along Sungai Besi Road

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Planning is used by the financial manager to recognize steps which must be taken to achieve objectives that are sought by the organization.…

    • 252 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Red River Floodway, built between 1962 and 1968 for a cost of $63 million, was one of the most effective and significant flood protection infrastructure in the Province of Manitoba, Canada ("Red river floodway," 2011). Ever since it had been putting in use, it has prevented more than $40 billion (in 2011 dollars) in flood damage in Winnipeg ("Red river floodway," 2011). However, after 1997 "Flood of the Century," the International Joint Commission analyzed the flood protection measures and concluded that, under situations similar to the flood in 1997, there would be a high risk of failure for Winnipeg's flood protection infrastructure ("The need for," ). As a result, the Commission recommended the government to take immediate actions to improve…

    • 1377 Words
    • 6 Pages
    Powerful Essays
  • Better Essays

    The Monitor-Merrimac Memorial Bridge-Tunnel (MMMBT) is one the three major highway bridge-tunnel facilities in Virginia. A bridge-tunnel is a facility where a bridge transitions into a man-made portal island. A bridge tunnel is used in Virginia because of the wide of water located there, which makes an all tunnel route extremely expensive. The Monitor-Merrimac Memorial Bridge-Tunnel is one of the largest, unknown water-crossing facilities in the world.…

    • 951 Words
    • 4 Pages
    Better Essays
  • Powerful Essays

    On March 15 March 2001 Australia's second largest insurer, HIH collapsed with debts in excess of A$5billion. This report intends to discuss some of HIH's business objectives and creative accounting practices that may have attributed to the collapse of the company.…

    • 2339 Words
    • 8 Pages
    Powerful Essays
  • Better Essays

    Katrina Case Study

    • 1246 Words
    • 5 Pages

    Hurricane Katrina carries a great impact on the lives of American as well as the view of infrastructure and engineering in the public mindset. If you ask the general public what lead to the demise of New Orleans back in 2005 many will say it was the failed levees that left Louisiana and the 9th District underwater and cost the lives of innocent people who believed they were safe. But why did these levees fail? What could have been done from an engineering standpoint to fix these levees and perhaps save lives, homes, and livelihood. Even as Louisiana was underwater the U.S. Army core of engineers began to survey the system and damage to determine a plan and study the system failure. Ethically it is an engineers expectation to anticipate potential failures, avoid being negligent, design according to best practices, and continually evaluate the need for corrections. According to the National Science Foundation in a report…

    • 1246 Words
    • 5 Pages
    Better Essays
  • Good Essays

    The main mitigation tool available to those who are potentially exposed to flooding in our area is that of hazard identification and mapping. Additionally, structural controls are equally as important in the…

    • 314 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Flooding has been a continual issue since the first settlers arrived in America. Using methods to deter and/or collect water protects the communities living in that area, but proper maintenance to those barriers must be ensured. Without proper maintenance to these infrastructures, levees can break, dams can crack or collapse leaving disaster behind. Hurricane Katrina’s faulty levees reveal the extreme consequences of neglecting these protectors in places where people depend on them (Wenger, 247). There were many devastating disasters that prompted new analysis and evaluation on flooding conditions and methods to reduce damage and cost. Flood insurance was established for areas that are located within the floodplain (302), as well as the…

    • 196 Words
    • 1 Page
    Good Essays
  • Better Essays

    Planning is the first of the four core functions of management. In planning, a company makes an assessment of the state of the company at that time and envisions where they want the company to be in the future. Once an assessment has been completed, the company will determine the course of action necessary to achieve those goals.…

    • 854 Words
    • 4 Pages
    Better Essays
  • Powerful Essays

    3. Husdal, J, 2005, The vulnerability of road networks in a cost-benefit perspective. Proceedings of the the Transportation Research Board Annual Meeting 2005, Washington DC, USA, 9-13 January 2005…

    • 3373 Words
    • 14 Pages
    Powerful Essays
  • Powerful Essays

    Chunnel Project

    • 9442 Words
    • 38 Pages

    Veditz, L. A. (1993). The Channel Tunnel: A case study. Executive Research Report (pp. 1–22).…

    • 9442 Words
    • 38 Pages
    Powerful Essays
  • Good Essays

    Asset management is the basic procedure which allow manager to acquire company’s data such as financial data, and company’s resources and that allows them to manage, renew and disposing of unwanted resources.…

    • 659 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Hurricane Katrina was a devastating disaster, which killed more than 1,800 people, engendered the displacement of thousands of people, and occasioned severe damaged to properties (Russell, 2015). According to the same source, more than 80% of New Orleans was flooded during the event in 2005. The geomorphologic situation of the city (altitude -1m, location on the bank of the Mississippi River), and the protection barriers failure are the main sources of its vulnerability. The reconstruction of many of the city’s infrastructures started, and most of them are at the stage of finishing 10 years after the impact of the incident (Russell, 2015). The reconstruction of the city was necessitated by the unwillingness of the city’s natives to move definitely…

    • 454 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Bibliography: LINSLEY et all.: Water Resources Engineering, Singapore, 1992. SCHULLER, Mark: Deconstructing the Disaster after the Disaster: Conceptualizing Disaster Capitalism, in: Gunewardena, Nandini/Schuller, Mark: Capitalizing on Catastrophe, Plymouth, 2008. Internet 1: Encyclopedia Britannica, in the internet: Last update: unknown, researched on: 11.4.2009 Internet 2: DIXIT, Ajaya: Kosi Embankment Breach in Nepal: need for a Paradigm Shift in Responding to Floods, in Economic & Political WEEKLY, Vol. 44, Issue 6, P. 70-78, 2009, accessed via discuss-kosi@googlegroups.com mailing list on 08/04/2009. Internet 3. POUDYAL Chhetri, Meen B.: A Practitioner’s View of Disaster Management in Nepal: Organisation, System, Problems and Prospects, in: Risk Management, Vol. 3, No. 4, P. 63-72, 2001, in the internet: Last update: unknown, researched on: 10.4.2009 Internet 4: SIDDIQUI, Zakarai: Report of the JNUSU Team’s Third Visit for Bihar Flood Relief Work, in the internet: Last update: unknown, researched on: 06.4.2009 Internet 5: SSVK (ed.): Kosi Flood 2008 an overview by SSVK, in the internet: Last update: 23.01.2009, researched on: 06.4.2009 Internet 6: MISHRA, Dinesh Kumar: Bihar Floods the inevitable has happened, in the internet:…

    • 3985 Words
    • 16 Pages
    Powerful Essays
  • Good Essays

    By doing so will open up more space for development of residence in the area, as well as the tourism sector for accommodation in the city. This project will enhance the safety and security of the developed areas within the boundaries of inner Cape town and possibly influence the whole Cape town in general.…

    • 1160 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Paniqui Website

    • 545 Words
    • 3 Pages

    Safety is one of the most significant reasons of developing systems this is to reduce the risk of accidents and catastrophic events. Being ahead of the situation, we can minimize problem and planned to ensure our safety. Floods are natural hazards that can be disastrous during storms or prolonged rainy days. Heavy rainfall in an extended period of time causes calamities. Some of the regions sit below sea level and serves as a catch basin. This area is easily flooded. Weather is another factor to be considered, rainy seasons and storm may cause the irrigation system to overflow thereby flooding nearby barangays. Climate has changed abnormally though time. Now we experience intense heat of the sun followed by sudden rain and excessive heavy rainfall which we do not experience before.…