Preview

Lead Time Reduction

Powerful Essays
Open Document
Open Document
611 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Lead Time Reduction
Replenishment and lead time decisions in manufacturer–retailer chains
Shu-Lu Hsu a,*, Chun Chen Lee b a Department of Management Information Systems, National Chiayi University, Taiwan b Department of Accounting, Soochow University, Taiwan Department of Management Information Systems, National Chiayi University, 580 Sinmin Rd.,
Chiayi 600, Taiwan a r t i c l e i n f o
Article history:
Received 17 June 2008
Received in revised form 6 September 2008
Accepted 13 October 2008
Keywords:
Inventory
Integrated model
Lead time
Distribution free demand a b s t r a c t
This study investigates the decisions of replenishment and lead-time reduction for a singlemanufacturer multiple-retailer integrated inventory system in which the probability distribution of demand for each retailer is unknown but its mean and variance are given. A decision model is presented and a minimax distribution free procedure is applied to determine the lead time, the common shipment cycle time, the target levels of replenishments and the number of shipments per production cycle so that the expected total system cost can be minimized. A decision support system has been implemented on a personal computer to illustrate the application of the model.
 2008 Elsevier Ltd. All rights reserved.
1. Introduction
Many companies have recognized the significance of response time as a competitive weapon and have used time as a means of differentiating themselves in the marketplace. Lead time is the elapsed time between releasing an order and receiving it. By shortening lead time, suppliers can lower the safety stock, reduce the out-of-stock loss, and improve the customer service level. In many literatures, lead time is regarded as a decision variable and can be shortened at an extra crashing cost.
Liao and Shyu (1991) first developed an inventory model in which lead time was the unique decision variable. Ben-Daya and
Raouf (1994) extended the previous model by including both lead time

You May Also Find These Documents Helpful

  • Satisfactory Essays

    review 2320

    • 1612 Words
    • 7 Pages

    Cycle inventory—Q/2 Safety Stock inventory—SS*D Pipeline Inventory—L*D Cost of…

    • 1612 Words
    • 7 Pages
    Satisfactory Essays
  • Powerful Essays

    In an industry where companies are highly reliable on external agents for their sales and where these same agents favor organizations that offer relatively faster Turn around times (TAT) the TAT is very important for the competitive advantage in this business.…

    • 3899 Words
    • 16 Pages
    Powerful Essays
  • Better Essays

    the demand for the item is uncertain. We can find such a model in problems dealing with the…

    • 2210 Words
    • 21 Pages
    Better Essays
  • Better Essays

    Lead Time Reduction Methods

    • 2711 Words
    • 12 Pages

    [Simeonovova 2011] Simeonovova, I. Manufacturing order management in company. Brno: VUTBR, Faculty of business and…

    • 2711 Words
    • 12 Pages
    Better Essays
  • Good Essays

    Barilla Operations Case

    • 855 Words
    • 4 Pages

    Since the manufacturer cannot anticipate which lines will be in greatest demand, lead time is increased, as the manufacturer cannot tailor production to the increased demand until determining which line to produce. These lead times essentially result in a whip-lash effect, in which the factories over-react to stock outs. This results in higher inventory and higher costs.…

    • 855 Words
    • 4 Pages
    Good Essays
  • Better Essays

    Department of Accounting and Information Technology, National Chung Cheng University, Min-Hsuing Chia-Yi, Taiwan, Republic of China…

    • 8893 Words
    • 36 Pages
    Better Essays
  • Powerful Essays

    Oxford Plastics Company

    • 11559 Words
    • 47 Pages

    * Corresponding author: RSM Erasmus University Department of Accounting & Control Burgemeester Oudlaan 50 3062 PA Rotterdam The Netherlands Tel.: +31 10 4081199 E-mail address: dallavia@rsm.nl…

    • 11559 Words
    • 47 Pages
    Powerful Essays
  • Satisfactory Essays

    Cross Docking

    • 304 Words
    • 2 Pages

    Decrease in lend times achieved through the ability to better anticipate incoming order from the retailers.…

    • 304 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    The next issue facing the members of supply chain had to do with the time limitations and delivery schedules between orders. This effect, according to the article “The Bullwhip Effect in Supply Chains” was referred to as ‘order…

    • 1249 Words
    • 5 Pages
    Better Essays
  • Better Essays

    Reduce Lead Time

    • 3561 Words
    • 15 Pages

    4/4 Development [weeks] Buffer [weeks] Money/ Feature/ Week [EUR] Sum [EUR] / year 4 4 $10.000,00 $2.640.000,00 100,00% 2/0 2 0 $10.000,00 $6.500.000,00 246,21%…

    • 3561 Words
    • 15 Pages
    Better Essays
  • Powerful Essays

    Burtons Snowboards

    • 1495 Words
    • 6 Pages

    The available to promise process was taking hours to complete. (Available to promise, in response to customer order enquiries, reports on available quantities of a requested product and delivery due dates.) Burtons wanted to speed up this process so that its dealers and retail customers would have more precise information about the availability of items not in stock. Strengthening customer and supplier intimacy in this way forms strong ties with them, which reduces the likely hood of new market entrants taking customers from them.…

    • 1495 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Faster time-to-market – Faster delivery of product to market due to the omission of product bugs detected by our software testers. Our ability to deduct what could be wrong right in the planning/design phase of the product greatly reduces the number of bugs during the development up to the production period.…

    • 1169 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Some practitioners have sought to adapt the deterministic EOQ model to reflect the probabilistic nature of demand by using an approximation that superimposes a constant buffer stock on the inventory level throughout the entire planning horizon. The size of the buffer is determined such that the probability of running out of stock during lead time (the period between placing and receiving an order) does not exceed a prespecified value.…

    • 1270 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Transport and Goods

    • 695 Words
    • 3 Pages

    15. Lead time is the time it takes to produce and supply a product – срок поставки…

    • 695 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Risk Pooling

    • 523 Words
    • 3 Pages

    Lead Time and Lead Time Variability: Lead time, however in this case study is considered to be same even though they take a centralized distribution system or a current multiple warehouse distribution system. But Lead time can be reduced if we avoid a Centralized Distribution System. The reason being, if there are multiple warehouses it may be closer to the retailers to get the product faster. Coming to lead time variability‘s impact on inventory we should again consider it with Centralized Distribution System or the one taken in the case study. The variability would be much lower with the Centralized Distribution System compared to the combined variabilities faced by the existing warehouse. With this we can see a major impact on the inventory levels.…

    • 523 Words
    • 3 Pages
    Good Essays