Preview

Intro to Bim

Best Essays
Open Document
Open Document
3166 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Intro to Bim
ASSESSING THE IMPACT OF NEW RULES OF COST PLANNING ON BUILDING INFORMATION MODEL (BIM) SCHEMA PERTINENT TO QUANTITY SURVEYING PRACTICE
Wilfred M. Matipa1, Paul Cunningham1, and Bhaven Naik2
1 2

Liverpool John Moores University, School of the Built Environment, Liverpool, UK Department of Civil Engineering, University of Nebraska, 126 Nebraska Hall, Lincoln NE 68503, USA Not until recently, the establishment of a whole life cycle budget for a constructed facility largely depended on the initiative of using the standard method of measurements (SMM) structural approach to the development of a cost or budget plan. This method, argues the RICS (2009), “created inconsistency in measurement and descriptions, resulting in the production of unclear basis for the estimates”. The constraints associated with traditional cost planning and estimating tend to be compounded by the complexity associated with the deployment of building information model (BIM) technology that is pertinent to the achievement of whole life cycle cost management of a constructed facility. This research is aimed at exploring the impact of the new rules of measurement on the building information model schema pertinent to the quantity surveying practice on construction based projects. The research presumes that even though the new rules of measurement are not mandatory, they are likely to influence cost planning and estimating practice because they have been developed with a view to setting “the best practice” in the development of cost plans. The likely impact could subsequently affect the current building information model schema for cost management. Keywords: building information model, cost planning, quantity surveying, standard method of measurement.

INTRODUCTION
The cost planning process arose out of the need to plan effectively the cost of a construction project from inception through design and continuing throughout the construction phase (Corbett and Rowley, 1999). Because of financial



References: Ashworth, A (2004) Cost studies of buildings 4th ed. Oxford: Prentice Hall. Ashworth, A (2008) Pre-contract studies: development economics, tendering and estimating. 3rd ed. Oxford: Blackwell Publishing Ltd. Best, R and Valence, G (2002) Design and constructions: building in value. Oxford: Butterworth-Heinemann. Bowen, P A and Edwards, P J (1996) Interpersonal communication in cost planning during the design stage, 14(5), 395-404. 631 Matipa, Cunningham and Naik Corbett, P and Rowley, P (1999) The use of BCIS elemental cost data by quantity surveyors as part of cost planning techniques: the practioners’ perspective. In: Hughes, W (Ed.), 15th Annual ARCOM Conference 15-17 September 1999 Liverpool John Moores University. Association of Researchers in Construction Management, pp465-72. Halfawy, M R and Froese, T (2002) Modelling and implementation of smart AEC objects: an IFC perspective, CIB W78 conference – Distributing Knowledge in Building”, Aarhus School of Architecture, Denmark, pp1-8. Howard, R and Björk, B C (2007) Use of standards for CAD layers in building, Automation in Construction16 (3), 290-297. Jeong, Y S, Eastman, C M, Sacks, R and Kaner, I (2009) Benchmark tests for BIM data exchanges of precast concrete, Automation in Construction 18, 469-484. Kirkham, R J (2007) Ferry and Brandon’s cost planning of buildings 8th ed. Oxford: Blackwell Publishing. Linderoth, A H C J, (2008) Learn not to learn: a way of keeping budgets and deadlines in ERP-projects? Enterprise Information Systems, 2, 77-95. Matipa, W M, Kelliher, D and Keane, M, (2009) A strategic view of ICT supported cost management for green buildings in the quantity surveying practice, Journal of Financial Management of Property and Construction, 14 (1), 79-89. Orlikowski, W J, and Gash, D C, (1994) Technological frames: making sense of information technology in organizations, ACM Transactions on Information Systems, 12 (2), 174207. Penttilä, H, (2006) Describing the changes in architectural information technology to understand design complexity and free-form architectural expression, Special Issue The Effects of CAD on Building Form and Design Quality, ITCON 11, 395-408. Royal Institute of Chartered Surveyors (2009) RICS new rules of measurement: order of cost estimating and elemental cost planning 1st ed. London: Royal institute of Chartered Surveyors. Succar, B., (2009) Building information modelling framework: A research and delivery foundation for industry stakeholders, Automation in Construction 18, 357-375. Tas, E., Yaman, H., (2005) A Building Cost Estimation Model Based On Cost Significant Work Packages, Engineering Construction and Architectural Management, 12 (3), 251-263. The Building Cost Information Service (2001) Standard form of cost analysis, London: Royal Institute of Chartered Surveyors. Vanlande, R, Nicolle, C and Cruz, C, (2008) IFC and building lifecycle management, Automation in Construction 18, 70-78. 632

You May Also Find These Documents Helpful

  • Better Essays

    Contract Breach

    • 1284 Words
    • 6 Pages

    Uher, T., Davenport, D. (2009, Ch.8, pg.165) Fundamentals of Building Contract Management (2nd Edition), UNSW Press, Sydney, NSW, AUS.…

    • 1284 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    Sutter Medical Center Case

    • 1363 Words
    • 6 Pages

    Along with this, the history of BIM and the quantity surveyor was also considered. This was useful as it allowed the effects of BIM on a Quantity Surveyor to be analysed. This also fed in with the benefits and limitations of BIM, as well as the future of the software and its effects on the role of a Quantity Surveyor.…

    • 1363 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Hnc Forms of Construction

    • 3301 Words
    • 14 Pages

    Contents 1.0 Introduction 2.0 Methodology 3.0 Inception 4.0 Feasibility 4.1 Overview of stage 4.2 Assessing the feasibility 4.3 Site investigation 4.4 Effects on design 5.0 Then brief 5.1 Overview of stage 5.2 What the brief should cover 5.3 What the brief should include 5.4 Consultants at this stage 6.0 The concept/outline proposals 6.1 Overview of stage 6.2 Requirements to proceed with concept design 6.3 Developing the brief into concept design 6.4 Planning permission 6.5 Building regulations approval 6.6 Achieved at this point 7.0 The design development 7.1 Overview of stage 7.2 Developing the design 7.3 Finalisation of design 7.4 Planning proposal 7.5 Building regulations 7.6 Sampling and testing 7.7 Health and Safety 7.8 Achieved at this stage 8.0 Technical design 8.1 Overview of stage 8.2 Implications on design 9.0 Production phase 9.1 Overview of stage 9.2 Design implications 10 Other construction projects…

    • 3301 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    This project plans to develop a methodology to estimate future projects’ costs and their appropriate contingency reserves for changing prices in constructional projects. Based on the methodology, recommendations will be given in order to change Ministry of Construction’s policies that relates to project budgets, and how to deal with the current policies if they are not changed.…

    • 311 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Construction Congress, Walsh, K. D., American Society of Civil Engineers., M.E. Rinker, Sr. School of Building Construction., & International Council for Building Research, Studies and Documentation. (2000). Construction Congress VI: Building together for a better tomorrow in an increasingly complex world : proceedings of the congress : February 20-22, 2000, Orlando, Florida. Reston, Va: The Society.…

    • 1188 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Stadium Contracts

    • 1057 Words
    • 5 Pages

    A design and build project allows the low risk factor as for the client has the contractor takes on the risk by offering a fixed cost contract. The web address designbuild-network.com states the original provision for a building cost was around £352m, with total project costs of £757m. A fixed price contract protects the client from any expiring costs, for example if the construction of the stadium was to have any over runs or delays.…

    • 1057 Words
    • 5 Pages
    Good Essays
  • Best Essays

    Smith, J. and Jagger, D. (2007). Building Cost Planning forthe Design Team. Available: http://zh.scribd.com/doc/36232724/Building-Cost-Planning-for-the-Design-Team. Last accessed 10/11/2012.…

    • 2267 Words
    • 10 Pages
    Best Essays
  • Powerful Essays

    busi 414 final paper

    • 3812 Words
    • 11 Pages

    References: Chini, A. R., & Valdez, H. E. (2003). ISO 9000 and the U.S. Construction Industry. Journal Of Management In Engineering, 19(2), 69. DOI 10.1061/ (ASCE) 0742-596x (2003) 19:2 (69).…

    • 3812 Words
    • 11 Pages
    Powerful Essays
  • Powerful Essays

    In the last few decades, the quest for continuous improvement and innovation has led to the discovery of new approaches to best practice by different players in the construction industry in the United Kingdom. These efforts have been initiated with the view to increase understanding of the needs of key business areas as well as increase client, users and stakeholders ' value. In this regard experts in the field of construction have proposed "rethinking of construction" (Egan 1998) by strategically rethinking operational stages in order to decrease cost and improve performance. One of these strategic operational stages, called the briefing process has perked the interests of the researcher in the course of producing a report on value management. During a research of a case study on ABC, the researcher has observed that without a clearly defined and articulated brief, the concept of "client value" can alter with each individual 's perception. Such alterations can have a deep impact on the quality and the performance of construction projects.…

    • 1657 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Scaffolding

    • 14883 Words
    • 60 Pages

    Published by: Construction Industry Scaffolder’s Record Scheme (CISRS) First published 1978 Revised 1986 Revised 1988 Revised 1993…

    • 14883 Words
    • 60 Pages
    Powerful Essays
  • Better Essays

    Building Information Modelling is a building design and documentation system based on coordinated, reliable, high quality information. This system enables the design and construction teams to create and manage information about a project consistently and reliably across the scope of the project. This information is stored in a unique model which ensures the information is coordinated, consistent and complete.…

    • 1269 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    Research Paper

    • 17807 Words
    • 72 Pages

    DETR (1998), Rethinking Construction, Report of the Construction Industries Task Force chaired by Sir John Egan…

    • 17807 Words
    • 72 Pages
    Powerful Essays
  • Powerful Essays

    Back in the day before there were computers the whole construction process was done by pen and paper from the bidding process to the actual drawings themselves. Since the innovation of the computer and interactive software these processes have gotten much more efficient. There have been many programs that ease the construction process. Such programs include, drawing software (AutoCad), spreadsheet software (Microsoft Excel), programs to assist with estimating (Plan Swift), planning and scheduling software (Microsoft Project), the internet as well as e-mail. There have always been minor updates on these programs but have mostly remained with the same basic purpose. Within the last 5 years a new state of the art program developed by AutoDesk using 3D Modeling has been integrated into many large jobs in Canada while in the USA it has been used regularly for about 10 years. This program is called Building Information Modeling and for short, BIM. There are many companies that do not know about BIM or have heard of it but have never used it or seen it being used.…

    • 1311 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Building Information Modelling (BIM) is a new evolution in process coordination. The access, management and coordination of information is integrated into a database system, lending its self to process automation and ensuring that all parties are privileged to the same, up-to-date information. The facility to keep the information accessible and up-to-date within the BIM integrated digital environment provides all parties, especially clients, a clear overall vision of their project allowing them the ability to make better decisions faster, enhancing quality and improving project profit. As a result many benefits are obtained (cost and time savings etc...) allowing engineers to deliver high quality, high performing, sustainable and efficient projects that will inevitably ensure that the needs of today are met without compromising the need for future generations to provide for themselves.…

    • 6127 Words
    • 25 Pages
    Powerful Essays
  • Powerful Essays

    4d Planning

    • 4096 Words
    • 17 Pages

    A. Retik, “Planning and monitoring of construction projects using virtual reality.” Proj. Manage. J., vol. 97, no. 1, pp. 28-31, 1997. [2] B. Koo and Fischer, “Feasibility of 4D CAD in commercial construction.” J. Constr. Eng. Manage., vol. 126, no. 4, pp. 251-260, 2000. [3] M. Fischer, “Benefits of four-dimentional (4D) models for facility owners and AEC services providers.” Proc. 6th construction congress D.K. Walsh ed., ASCE, Reston, pp. 990-995. [4] V. K. Bansal and M. Pal, “Potential of geographic information systems in building cost estimation and visualisation.” Autom. Constr., vol. 16, no. 3, pp.311-322, 2007. [5] Chang Kang-tsung, “Introduction to Geographic Information Systems, Tata McGraw- Hill Edition, New Delhi, p. 432, 2006. [6] A. R. Oloufa, A. Ethan, and C. S. Papacostas, “ Integrated GIS for construction site investigation .” J. Constr. Eng. Manage., vol.120, no. 1, pp.211-222, 1994. [7] M. Y. Cheng and J. T. O’Connor, “ArcSite: Enhanced GIS for construction site layout.” J. Constr. Eng. Manage. vol. 122, no. 4, pp. 329-336, 1996 [8] M. Y. Cheng and S. C. Yang, “GIS based cost estimates integrating with material layout planning.” J. Constr. Eng. Manage. vol. 11, no. 4, pp.291-299. 2001. [9] M. Y. Cheng and J.C. Chen, “Integrating barcode and GIS for monitoring construction progress.” Autom. Constr. vol. 11, no. 1, pp. 23-33, 2000. [10] D. Udo-Inyang and C. H. Uzoije, “HICIMS: An Integrated GIS and DBMS application.” Proc., 4th Computing incivil engineering congress, T. M. Adams, ed., ASCE, New York, pp. 240-247.…

    • 4096 Words
    • 17 Pages
    Powerful Essays