Preview

How Do We Optimize Well Performance (Reservoir Management

Good Essays
Open Document
Open Document
758 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
How Do We Optimize Well Performance (Reservoir Management
-How do we optimize well performance (reservoir management)? Gas
Production Separator
Production Separator

Test
Separator
Oil

Water
Wellhead

ANSWER
To optimize well performance is actually a difficult task because usually we faced the lack of data we needed and many unknown involves.
To overcome this problem, based from Erik Vikane, SPE, is Manager of Reservoir Management at StatoilHydro, he applying three stages method: * Stage 1—Historical Surveillance Data Compilation * Stage 2—Data Interpretation and Identifying Value Addition * Stage 3—Quantify Value To Justify the Need for the Acquired Data.
(Obtain from, www.spe.org/jpt/print/archives/2009/09/15RPMFocus.pdf, at 22nd November, 2012)

All in all, those stages come back to the basic which the needs of sufficient data to conduct an action plan. From what we learned at Emerson Process Management last week, a transmitter is a tool which usually installed in the controller, which use to transfer the data from the field-site indicator to the control room, let say we use a Distributed Control System (DCS). Then, based from the data gathered an action might be needed to optimize the well performance, this is when the Final Control Element (FCE) come in handy. Of course there is some mathematical model needed to be generated to transfer those data into valuable information, but without the data gathered on-field and the action taken by the FCE the well will not be optimize. Thus, basically to optimize this well performance the control valves must be installed on the pipeline.

This is the basic control valves installed to give the idea what we have learned at Emerson. There are actually many more complex control elements in the real reservoir but we only learned four basic element

You May Also Find These Documents Helpful

  • Satisfactory Essays

    4. Controlling-The last stage in the four management functions involves the monitoring of the firm’s performance in order to guarantee that the company’s goals are being met. Managers also need to become aware of their costs versus the performance of the organization as a whole.-For instance, if a financial institution has a goal of increasing their loan portfolio by 10% over the next 2-3 months, the managers in each branch will need to monitor the progress toward their…

    • 340 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Solution: A Control system has four control steps i.e. Setting performance standards, Measuring performance, Comparing performance against the standards and determining deviations, Taking action to correct problems and reinforce successes.…

    • 250 Words
    • 1 Page
    Good Essays
  • Good Essays

    Meeting the world’s growing water needs will require far more effective use of available resources. By combining appropriate technology, strategic management and involving all the players water conflicts can be avoided.…

    • 915 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Wells Fargo Competitor

    • 1650 Words
    • 7 Pages

    Take the time to record and establish baseline performance against which improvement could be measured. Goals set for process improvement appear to be arbitrary (i.e., “25% reduction of testing defects” without first establishing what the average is).…

    • 1650 Words
    • 7 Pages
    Good Essays
  • Good Essays

    mark

    • 1389 Words
    • 6 Pages

    A control room inside of an oil refinery can be compared to the nervous system of the human body. The control room is the main headquarter where all the information is obtain and then used to perform any task necessary. The steps an operate must follow is: define, measure, analyze, improve, and control.…

    • 1389 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    Scope Field Project

    • 4252 Words
    • 18 Pages

    The properties of the reservoir can be expected to change due to the effect of heterogeneity which is described as in the results section of this report. A platform and certain vertical and horizontal wells were suggested where the vertical wells were suggested to be drilled in the thick oil column which is at the…

    • 4252 Words
    • 18 Pages
    Powerful Essays
  • Powerful Essays

    o consider accuracy, efficiency and effectiveness when solving problems and reflect on what has been learnt…

    • 3070 Words
    • 13 Pages
    Powerful Essays
  • Good Essays

    Cranberry and Berries

    • 1276 Words
    • 6 Pages

    1. In the current flow of the process, identify the bottleneck areas. What recommendations, both short-term and long-term, would you make to solve the bottleneck problem?…

    • 1276 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Fracking Water Shortage

    • 336 Words
    • 2 Pages

    Aquifers are being depleted at an increasing rate and our water tables are sinking. We must reduce our water usage, while still maintaining our human needs. Fracking must be stopped, not only does it pollute people's drinking water, it also depletes our aquifers. When fracking occurs water is forced way below our water tables, never to be accessed again. IN this age we cannot afford to waste water in that way. Countries living in desert-like conditions should not expand their agriculture. Expanding to the desert will allow for a short time for those countries to be less depend upon others for food sources. However, the aquifers will be depleted and there will be a lack of food left. Countries in areas with water shortages will have to find ways to either farm with minimum water or seek outside assistance. We need to invest in more reach in desalinization. At the moment desalinization is a very expensive option that water companies are beginning to invest in. Governments in countries with few water resources should invest in these practices, even if it is expensive. Running out of water should not be an option. They should invest in more rainwater collection. We need to readdress how we look at the water. It is not necessarily a never ending cycle of harmony, we must invest in…

    • 336 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    In this file MGT 330 Week 5 Discussion Questions 2 there is a solution on this problem: "What are the different types of control systems? What are some advantages and disadvantages of the various control mechanisms? How does your organization use the steps of the control process?"…

    • 465 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Safe yield was originally defined as the amount of water that could be developed from a ground water reservoir without depletion of its reserves. Over time the definition has changed as economics, protection of ground water, and environmental affects have been considered in this concept as well. So, safe yield is now defined as the amount of naturally occurring ground water that can be taken from an aquifer on a regular basis, economically and legally, without affecting the native ground water quality or forming an unwanted effect such as environmental damage. When pumping water from a ground water supply, there are many possible adverse environmental effects. By lowering stream flow it can lower lake levels or dry up wetlands. It can also then have a negative effect on infrastructures; as it can lower the land surface and cause cracking in the land surface, damaging pipes, buildings, highways, dams and more. There are many other adverse effects, and in broad spectrum this may include ecological, economical, social, cultural, and political effects. However, it is debatable what constitutes an undesirable effect. Specific yield also does not take into account the relationship between surface and ground water. It takes a deep and broad evaluation by experts of multiple fields to determine safe-yield values. Computer models are used for making ground water models and computing safe yield values.…

    • 693 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Oil Drilling NEG

    • 32390 Words
    • 70 Pages

    Research is needed to account for the unrecovered injected fluid, to optimize water management strategies, and to analyze the impact of abandoned oil/gas wells on fluid/gas migration…

    • 32390 Words
    • 70 Pages
    Powerful Essays
  • Satisfactory Essays

    Module Six & Final Exam

    • 2475 Words
    • 10 Pages

    After objectives and standards are set, what step comes next in the control process? _________…

    • 2475 Words
    • 10 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Delegation and Control

    • 865 Words
    • 4 Pages

    As a manager, I would need to consider the three major control types to use. Based on timing, Feedforward, concurrent and feedback are the main types of control.…

    • 865 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Reservoir Geoscience Dr Essam Mansour Ahmed Associated professor Geoscience & Petroleum Engineering Department Universiti Teknologi PETRONAS Bandar Seri Iskandar, 31750 Tronoh, Perak Darul Ridzuan, Malaysia D/L:605-368 7290 Email: essam.mansour@petronas.com.my 14-03-35 Learning Outcomes Students should be able to :  Interpret the Depositional Environment of sedimentary rocks  Analyze petrophysical properties and subsurface facies from log and seismic  Interpret Reservoir Distribution and Geometry  Describe Hydrocarbon Distribution in a reservoir through geophysical and geochemical studies Learning Outcome-3 &4 Interpret Reservoir Distribution and Geometry & Describe Hydrocarbon Distribution in a Reservoir Reservoir Continuity (1) Geological Time (2) Steno’s Principles Reservoir Continuity (1) Basin Architecture (2) Sequence boundary (3) Lithostratigraphy (3) Diagenesis related to unconformity (4) Geological Events  (4) Slope & Basin floor fans…

    • 2174 Words
    • 9 Pages
    Powerful Essays