Preview

Hardware Replacement

Good Essays
Open Document
Open Document
806 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Hardware Replacement
Hardware Replacement Project
IT/205
Randy Atkins
December 16, 2012

Hardware Replacement Project The IT department wants to replace their old CRM with a new CRM solution. The only problem is that their existing hardware is old and out of date and will not support the new CRM. I was brought in to not only recognize the issue but to determine what equipment will be needed and help install the equipment. This needed to be done before the new CRM system can be installed and implemented. Before that could happen I first needed to come up with a report for the board that will discuss about the five project management variables and how they relate to the upcoming plans. I will also explain what considerations should be thought about as to get the company the best value and what factors will influence the project risk along with how to keep those risks down to a minimal amount.
To get the image of how the new CRM will work out the five major variables of project management must be examines to see how they will fit in to the scenario. The five major variables are scope, time, cost, quality, and risk. Every one of these variables will play a role in this project so I will discuss each one: The first scope defines what work is or is not included in a project. For this certain project there will be a scope for new processing equipment as well as computer equipment to implement the new CRM. The unsettlement of the scope for the project must not be crossed because it can disrupt the other variables which are time. Secondly, quality which means how the end results of the hardware replacement will satisfy the IT department’s wants and needs. The quality of the hardware replacement will be dependent on the time and cost because if you want betterment it will cost you and you cannot hurry replacing hardware or you might end up installing something that should not or buying the work hardware all together. When the project is finished and the hardware is performing as

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Schwalbe K. (third Ed.). (2003). Information Technology Project Management [University of Phoenix Custom Edition e-text]. Course Technology Publishing. Retrieved July 9, 2008 from University of Phoenix, Resource, CMGT/410–Project Planning and Implementation 410 Web site: https://ecampus.phoenix.edu/secure/resource/resource.asp…

    • 3456 Words
    • 14 Pages
    Satisfactory Essays
  • Good Essays

    The IT- department in implementing a new CRM solution to its corporate offices. The hardware currently in use is out of date and will not support the CRM application. The hardware must replace prior to deployment.…

    • 1016 Words
    • 5 Pages
    Good Essays
  • Best Essays

    MIS 535 Course Project

    • 2958 Words
    • 12 Pages

    This proposal will discuss all key aspects needed to ensure a seamless transition and implementation of an automated sales force CRM, or Customer Relationship Management, system. The intent of this transition is designed to improve three key aspects of day to day commercial business operations, those key aspects are: Streamline time spent providing key sales data and metrics for the organization, provide a consistent and standardized approach for how sales data is provided and gathered across the organization, and an easy to use and easy to navigate, operating system.…

    • 2958 Words
    • 12 Pages
    Best Essays
  • Good Essays

    IT 205 final assignment

    • 1253 Words
    • 6 Pages

    When hardware is outdated and needs to be replaced throughout an entire corporation, there are a few guidelines to assist getting the project off on the right foot. Managing such a large and expensive project can become overwhelming, and having a well-structured operating team, objectives in place, and researching what needs to be fixed takes a lot of stress off the project manager’s shoulders. It also has the effect of motivating employees to bring the same level of attention to their work as the managers did to theirs. Another set of items that are a live saver when planning a large-scale project such as revamping corporate wide hardware to properly and efficiently run a new customer relationship management (CRM) system are the five variables of time, scope, risk, cost, and quality.…

    • 1253 Words
    • 6 Pages
    Good Essays
  • Better Essays

    Project Management Institute. (2000). _A Guide to the Project Management Body of Knowledge (4th ed.)._…

    • 1150 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    IT 304

    • 16819 Words
    • 68 Pages

    ProjMan /IT Project Management: On Track from Start to Finish, 3rd ed. / Phillips / 015-3/ Chapter 1…

    • 16819 Words
    • 68 Pages
    Satisfactory Essays
  • Satisfactory Essays

    This is an assignment to apply Project Management for replacing hardware to install a new CRM (Customer Relationship Management) system in the corporate offices of an unnamed company. That's all you know about this project. The company isn't identified or how large it is, or how many customers they have, or where they are. Someone at the company would know this information, but you don't from the scenario provided in the syllabus. You are answering the below questions based on the information provided; make sure that you have reviewed the pages within chapter 11 in your text that introduce the concept of project management and all steps involved…

    • 321 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The business requirements define the boundaries in which the project team has room to operate in. Huffman requires that the new system be relatively inexpensive with little ongoing maintenance required. The new system should not require many hours of training in order to use. The new system should also be usable gout of the box.h…

    • 423 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Work-related project analysis is an investigation to help organizations make better choices about computer systems. The case study of Reliable Pharmaceutical Service is a delivery company who is looking to reduce costs while still providing a great customer experience. The service company analyzed the current situation by gathering information about clients. The project of implementing a new system was successful with satisfied management and a completed that met all the requirements and was within…

    • 1482 Words
    • 6 Pages
    Better Essays
  • Good Essays

    2. You work for LL Company, which manufactures high-end optical scopes for hunting rifles. LL Company has been the market leader for the past 20 years and has decided to diversify by applying its technology to develop a top-quality binocular. What kind of project management structure would you recommend they use for this project? What information would you like to have to make this recommendation, and why?…

    • 1262 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Project Plan Outline

    • 5445 Words
    • 22 Pages

    This document is an annotated outline for a Project Management Plan, adapted from the PMI Project Management Body of Knowledge (PMBOK) and IEEE Standard for Project Management Plans. The Project Management Plan is considered to be a “Best Practice” template by the ETS Enterprise Program Management Office (EPMO).…

    • 5445 Words
    • 22 Pages
    Good Essays
  • Powerful Essays

    Orion Shield Project

    • 5525 Words
    • 23 Pages

    Executive Summary The basic concepts of project management calls for proper planning, organization and the management of a variety of resources in order to successfully achieve a certain goal. One of the most important objectives of project management is the ability to deliver a product or service within a certain time constraint or “on time” as well as being fiduciary responsible or “within budget.” Thus, it can be seen that good project management makes efficient use of time, money, personnel, materials and supplies, and methods of communication in order to successfully complete a project. Unfortunately, these basic methods of project management were not…

    • 5525 Words
    • 23 Pages
    Powerful Essays
  • Powerful Essays

    References: (1) Information technology in business: Let me count the ways. (1992). CIO, , 1-1. Retrieved from…

    • 5678 Words
    • 23 Pages
    Powerful Essays
  • Good Essays

    The president of Crosby Manufacturing Corporation Mr. Livingston called a meeting with the department managers to resolve an issue they have. The issue is with the management cost and control systems (MCCS). The goal of the meeting is to update the current MCCS and increase the company’s business profits and growth. Mr. Livingston wants to upgrade the current software and computers with a more up to date version. This will help improve the (MCCS). The ideas brought up and the meeting discussed the feasibility study and the cost and time constraints to implement the big change. The EDP manager adds that they should also do evaluation of vendors besides the benchmarking tests. Tim Emary was appointed as the project manager and led the group to its goal with a timely finish.…

    • 1115 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Chunnel Project

    • 9442 Words
    • 38 Pages

    This case study was originally prepared as part of Project Management Applications, the capstone course of the Master of Science in Project Management in the Department of Management Science at The George Washington University, by the graduating students listed above with the supervision of Professor Anbari.…

    • 9442 Words
    • 38 Pages
    Powerful Essays