OBJECTIVE: The objective of this case is to explore the ranking differences that may result from using the PI, NPV, and IRR evaluation techniques. It illustrates the time disparity, size disparity, and life disparity problems and the appropriate approaches to the resolution of these problems. This case works well either as a homework problem coinciding with the introduction of project ranking and capital-rationing material or as an in-class problem lecture.
DEGREE OF DIFFICULTY: Moderately Difficult
Question Answers
Although all methods might grant projects acceptable ratings, NPV, PI, and IRR will not necessarily yield the same ranking order. Such a phenomenon is the result of different cash inflows over time (projects A and B), time horizons (projects E and F) and/or project sizes (projects C and D).
No. While, in general, it is true that when one discounted cash flow method (NPV, PI, or IRR) gives a project an acceptable rating, the other two methods also give this project an acceptable rating; it is not necessarily true that these discounted cash flow methods will rank these acceptable projects in the same order. Ranking differences may occur as a result of (a) the time disparity problem resulting from differences in the cash inflow patterns over time between two projects; (b) the size disparity problem, resulting from the comparison of projects requiring initial cash outflows of differing size; or (c) the life disparity problem, resulting from projects with differing lives. These problems are illustrated in the case with Projects A and B representing the time disparity problem, C and D, the size disparity problem, and with E, F, G, and H, the life disparity problem. The ranking problems incurred using the discounted cash flow methods are generally a function of the different assumptions made about the reinvestment opportunities for cash inflows over the life of the project.
2.

You May Also Find These Documents Helpful

  • Powerful Essays

    Project Management

    • 2565 Words
    • 9 Pages

    One of the top factors for prioritizing projects is the comparison of project costs versus…

    • 2565 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Volswagan case

    • 738 Words
    • 3 Pages

    Therefore, the best way of selecting a project is through the ranking system which will not only help the project team choose the project easily on the basis of priority but helps in problem solving too. The new process however has helped in improving the business units in a big way because these business units choose the right project efficiently compared to the previous processes.…

    • 738 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    In this case study Roger Gray and the Anderson Plastics Inc. Company has a many purchasing problems and concerns. All of these problems are not directly caused my Roger Gray himself or the purchasing department. In this report I will explain these problems and recommend ways in which these problems can be resolved.…

    • 782 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Oxford Plastics Company

    • 11559 Words
    • 47 Pages

    COMPUSTAT, CRSP 1980-2006 PACAP 1975-2000 Financial reports (websites and central banks) 2004-2009 COMPUSTAT, IBES, CRSP 1986-2005 COMPUSTAT 1980-2004 COMPUSTAT 1979-1998…

    • 11559 Words
    • 47 Pages
    Powerful Essays
  • Good Essays

    Zen Plastics Company

    • 653 Words
    • 3 Pages

    This report aims to examine partnership arrangements and clearly identify advantages and disadvantages in terms of entering the export market. Besides, it is necessary to have a competent understanding of how Zen Plastics would successfully go into the export market and what they do to achieve this. Critically look at Zen Plastics’ s structure to see if the exporting is a suitable strategy for the firm concerned.…

    • 653 Words
    • 3 Pages
    Good Essays
  • Better Essays

    The internal rate of return (IRR) and the net present value (NPV) techniques are 2 investment decision tools that satisfy the 2 major criteria for the correct evaluation of capital projects. This criterion is that the techniques should incorporate the use of cash flows and the use of the time value of money. This makes them viable techniques for evaluating investment proposals.…

    • 2562 Words
    • 8 Pages
    Better Essays
  • Good Essays

    Shorena

    • 2056 Words
    • 9 Pages

    The standard net present values (NPV) analysis of capital budgeting values a project by discounting its expected cash flows at a risk-adjusted cost of capital. This technique is by far the most widely used technique for evaluating capital projects. However, standard NPV analysis does not take account of the flexibility inherent in the capital budgeting process. Part of the complexity of the capital budgeting process is that we can change our decision dynamically, depending on the circumstances.…

    • 2056 Words
    • 9 Pages
    Good Essays
  • Powerful Essays

    This course covers fundamental concepts and techniques of financial forecasting and financial analysis including time value of money, cost of capital, capital investment decisions, product costing and lease-buy analysis.…

    • 14479 Words
    • 58 Pages
    Powerful Essays
  • Satisfactory Essays

    • Discounted Cash Flow Analysis - When you calculate IRR you will have one number for an objective comparison between capital projects.…

    • 525 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    The NPV approach takes into account the scale of the project and the IRR does not. For example…

    • 1442 Words
    • 6 Pages
    Better Essays
  • Good Essays

    Internal Rate of Return

    • 835 Words
    • 3 Pages

    Among its disadvantages we can find that requires finally are compared with an opportunity cost of capital to determine the decision on the project. That project in which the internal rate of return, we will accept it greater than the discount rate investor (relevant interest rate), the IRR criterion is not reliable to compare projects and only tells us whether a…

    • 835 Words
    • 3 Pages
    Good Essays
  • Better Essays

    Npv Comparison

    • 2310 Words
    • 10 Pages

    To this point neither of the two discounted cash flow procedures for evaluating an investment is obviously incorrect. In many situations, the internal rate of return (IRR) procedure will lead to the same decision as the net present value (NPV) procedure, but there are also times when the IRR may lead to different decisions from those obtained by using the net present value procedure. When the two methods lead to different decisions, the net present value method tends to give better decisions. It is sometimes possible to use the IRR method in such a way that it gives the same results as the NPV method. For this to occur, it is necessary that the rate of discount at which it is appropriate to discount future cash proceeds be the same for all future years. If the appropriate rate of interest varies from year to year, then the two procedures may not give identical answers. It is easy to use the NPV method correctly. It is much more difficult to use the IRR method correctly.…

    • 2310 Words
    • 10 Pages
    Better Essays
  • Good Essays

    Bethesda Mining zirconium

    • 1222 Words
    • 5 Pages

    In order to decide whether our company should undertake the project, we should refer to the project’s NPV and IRR. NPV indicates the possible profit (net cash flow) which the project will yield in future, a positive NPV suggests that company can earn profit from the investment and vice versa. IRR is the discounted rate which makes the NPV of all cash flows equal to zero, the greater the amount it exceeds the cost of capital (required rate of return), the higher the net cash flow to the investor, our company should go ahead with the project if its’ IRR is higher than the required rate of return. To obtain those numbers, we need to calculate the net cash flows (i.e. the incremental cash flows) generated by the project in each year of the project’s life.…

    • 1222 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    The long-term health of a firm is determined by the quality of its investments. In a…

    • 12099 Words
    • 173 Pages
    Powerful Essays
  • Good Essays

    Business Finance

    • 1349 Words
    • 6 Pages

    A: Net Present Value is a method to evaluate a project value. NPV requires an estimate of the cost of capital. Therefore, to understand what is NPV, Discount rate should be completely understand. The first advantage is that NPV gives important to the time value of money. Secondly, in the calculation of NPV, both after cash flow and before cash flow over the life span of the project are considered. Thirdly, profitability and risk of the projects are given high priority. Fourth, NPV helps in maximizing the firm's value. On contrary, NPV is difficult to use. Also, NPV cannot give accurate decision if the amount of investment of mutually exclusive projects are not equal. One difficulty would be calculation of appropriate discount rate. Meanwhile, NPV may not give correct decision when the projects are of unequal life.…