Fauquier Gas Company Case Study
Running Head: FAUQUIER GAS COMPANY CASE STUDY

Fauquier Gas Company Case Study

First Last Name
Course Name
Professor's Name
Date
Case Name: Pacific Healthcare
I. Major Facts
Fauquier Gas Company is one of the largest supplier of gas in the United States. Bill Murphy is the manager of Supply Management and is responsible for purchasing of materials used in distribution of gas such as pipes, meters, and fittings as well as other various materials. The supply organization falls directly under the vice-president for operations.
II. Major Problem
Fauquier Gas Company is slated to begin a new project to turn an area once used for agricultural work into a residential and commercial property. This means that new gas lines must be installed. In January, Mr. Murphy overheard Mr. Byers, the project manager, discussing the requirement to add 3.5 miles of new gas lines slated to begin in June with an estimated completion date of September (3 Months). Having worked with the procurement of gas lines before, Mr. Murphy knew that the mills needed substantial lead times in order to accommodate Fauquier Gas Company's timeline. Mr. Byers advised Mr. Murphy the purchase request would be sent as soon as the design engineer was finished with the specifications and the project engineer approved it, both work areas fall under the vice-president of operations.
When Mr. Murphy contacted Pat Wilson, the design engineer, he learned that the specifications of the pipes being ordered were changing from past orders. Instead of 3/8" wall thickness they were drawn at 3/4". This was done because the operation of the line would be governed by less stringent specification. The length of the pipes was also extended from 40'(+/-5') to 57' in order to reduce cost of welding. Lastly, the wrapping has yet to be determined which is supplied by the mill.
As of April 14th, the purchase request has not been received by Mr. Murphy and no order for pipes has been made. Construction



References: Burt, D. N., Petcavage, S. D., & Pinkerton, R. L. Supply Managment (Eight Edition ed.). New York, NY: McGraw-Hill Irwin, 2010. Net4Gas. Net4Gas: Connecting Markets. 8 April 2012 <http://www.net4gas.cz/en/faq-gazela/>.

You May Also Find These Documents Helpful

  • Better Essays

    Acme

    • 1450 Words
    • 8 Pages

    Jacobs, F.R & Chase, R.B. (2013). Operations and supply management: The core, 3e. Chapter 1 and Appendix A…

    • 1450 Words
    • 8 Pages
    Better Essays
  • Better Essays

    Great Lake

    • 2158 Words
    • 9 Pages

    Rubin attributes his success to two factors: service and dedication to quality. While many firms are concerned with the quantity of pipe they produce, right from the start Rubin was dedicated to manufacturing the best quality of pipe possible. He often tells his employees, “If we achieve quality, the quantity will take care of itself.” The company also provides exceptional service. GLPT keeps an unusually large…

    • 2158 Words
    • 9 Pages
    Better Essays
  • Better Essays

    Realco Breadmaster Company

    • 1027 Words
    • 5 Pages

    References: Bozarth, C.C., and Handfield, R.B. (2008). Introduction to operations and supply chain management (2nd ed.). Upper Saddle River, New Jersey: Pearson Prentice Hall.…

    • 1027 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Fluor Corporation (NYSE: LFR) - a publically traded company on the New York Stock exchange, founded in 1912. The company offers many services as a part of its five segments business: oil & gas, industrial & infrastructure, government, global services, and power subsidiaries. Fluor Corporation provides engineering, procurement, construction, fabrication and modularization, commissioning and maintenance, and project management services worldwide. The business operates in the United States and Canada, headquartered in Irving, Texas…

    • 480 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    References: Burt, Petcavage, & Pinkerton, Richard (2010). Supply Management. 8th Edition. New York, NY: McGraw- Hill…

    • 810 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    | Project was on a tight schedule as Kelly Constructions was convinced to cut off 03 month from the estimated 32 months of the project duration, with a promise of minimal changes to the original design. Eventually with the allowance of individual customization in the units, customers (i.e Millers) required drastic changes.…

    • 1263 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    contribution of a diverse culture in the country, the level of uniqueness and enchantment of…

    • 12624 Words
    • 42 Pages
    Powerful Essays
  • Good Essays

    In addition, due to the long history of the campus, many of the on-campus structures were old. As a result, they didn’t meet current regulations or have the ability for substantial technological change. This included many old pipes that cannot be…

    • 708 Words
    • 3 Pages
    Good Essays
  • Best Essays

    Apple E Business

    • 2472 Words
    • 10 Pages

    Tan, K.C., 2001, A framework of supply chain management literature, European Journal of Purchasing and Supply Management, Vol. 7 No. 1, pp. 39-48.…

    • 2472 Words
    • 10 Pages
    Best Essays
  • Good Essays

    Guide for Building and Classing

    • 47335 Words
    • 190 Pages

    This Guide applies to classification of design, construction and installation of offshore pipelines made of metallic materials, as well as the periodic surveys required for maintenance of classification. Serviceability of pipelines is also addressed, but only to the extent that proper functioning of the pipe and its components affects safety. This Guide may also be used for certification or verification of either design, construction or installation of pipelines. ABS will certify or verify design, construction and installation of offshore pipelines when requested by the Owner or mandated by government regulations to verify compliance with this Guide, a set of specific requirements, national standards or other applicable industry standards. If ABS certification or verification is in accordance with this Guide and covers design, construction and installation, then the pipeline is also eligible for ABS classification. This Guide has been written for worldwide application, and as such, the satisfaction of individual requirements may require comprehensive data, analyses and plans to demonstrate adequacy. This especially applies for pipelines located in frontier areas, such as those characterized by relatively great water depth or areas with little or no previous operating experience. Conversely, many provisions of this Guide often can be satisfied merely on a comparative basis of local conditions or past successful practices. The Bureau acknowledges that a wide latitude exists as to the extent and type of documentation which is required for submission to satisfy this Guide. It is not the intention of this Guide to impose requirements or practices in…

    • 47335 Words
    • 190 Pages
    Good Essays
  • Satisfactory Essays

    an engineer studing mba

    • 431 Words
    • 2 Pages

    1. There is growing demand for large- and medium-sized pipes among petroleum and natural gas industries in Saudi Arabia…

    • 431 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Drainage and Service Ducts

    • 15620 Words
    • 63 Pages

    Volume 1 Specification for Road Works Series 500 Drainage and Service Ducts DRAINAGE AND SERVICE DUCTS Contents Clause Title 501 Pipes for Drainage and Service Ducts 2 502 Excavation for Pipes and Chambers 6 503 Bedding, Laying and Surrounding of Pipes 7 504 Jointing of Pipes 8 505 Backfilling of Trenches and Filter Drains 10 506 Connecting to Existing Drains Chambers and Channels 11 507 Chambers 11 508 Gullies and Pipe Junctions 14 509 Testing and Cleaning 15 510 Surface Water Channels and Drainage Channel blocks 16 511 Land Drains 16 512 Backfilling to Pipe Bays and Verges on Bridges 17 513 Permeable Backing to Earth Retaining Structures 17 514…

    • 15620 Words
    • 63 Pages
    Powerful Essays
  • Good Essays

    Advertising Good or Bad

    • 741 Words
    • 3 Pages

    Schmalensee & R. Willig (ed.), Handbook of Industrial Organization, edition 1, volume 2, chapter 16, pages 951-1009 Elsevier.…

    • 741 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Operation Puto Case Study

    • 778 Words
    • 4 Pages

    The HAIS pipe was a “3” lead pipe, 2 layers of prepared tape, 1 layer of bitumen cotton, 4 layers of mild steel tape, jute bedding, a layer of steel armor wires, and an outermost layer of jute servings(PLUTO,PLUTO PIPELINE,PIPELINE UNDER THE OCEAN, Nov. 2014)”. Variants of these pipes are still used today for the transport of oil and gas under the ocean. During testing, they found out that the HAMEL pipe was the main pipe, but HAIS pipe was used on the end. The reason for that decision was that HAIS pipe had so much lead that every item of lead in England would be needed to produce the needed length of pipe for the operation.…

    • 778 Words
    • 4 Pages
    Good Essays