Preview

Excel Trick

Good Essays
Open Document
Open Document
2722 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Excel Trick
Table of Contents

1. INTRODUCTION
Tinekhu Khola Small Hydropower Project (TKSHP) with an Installed Capacity of 990 kW utilizes flow from Tinekhu Khola which is located at Suri and Jhyaku VDC’s of Dolakha District, Janakpur zone in Eastern Development Region of Nepal. Tinekhu Khola Small Hydropower Project (The Project) is Run off River (RoR) type with its headworks located in Tinekhu River at some 3 km upstream from the confluence of Tamakoshi River and Tinekhu River. The distance to the intake site from Singati Bazaar is about 6 km north-east. The powerhouse is located along the left bank of Tamakoshi River, some 100 m upstream from the confluence of Tamakoshi River with Tinekhu River. There is a bridge over Tamakoshi River near powerhouse and a seasonal road up to the forebay area.
The entire project area (headworks to powerhouse) is located in Suri and Jhakhu VDC’s of Dolakha District along the right bank of Tinekhu River. Geographically, the project area is located between the longitudes 86º10’45”E to 86º12’06”E and latitude 27º44’07”N to 27º45’15”N. Physio-graphically, the project area belongs to the Middle Mountain Zone and elevation ranges from 980 meter above mean sea level (amsl) to 1400 m amsl along the upper catchment boundary.
According to the hydrological study, the design discharge of 0.35 m3/s is about 57% exceedence river flow. Thus with a gross head of 412 m and net head of 392.01 m and 0.35 m3/s design flow at 74.5% efficiency the installed capacity will be 990 KW. The net annual energy generation at delivery point (i.e., substation at Singati) is expected to be about 6.60 GWh. The dry season energy is 1.71 GWh and wet season energy is 4.890 GWh.
The total project development cost is 193 Million NPR including Interest During Construction (IDC) and the construction period is estimated to be 23 months. Power Purchase Agreement (PPA) has been made on 8th Aswin 2069. The land acquisition on the project site has already been

You May Also Find These Documents Helpful

  • Satisfactory Essays

    excel worksheet

    • 654 Words
    • 3 Pages

    You: We follow the steps in following order to provide Dynamic Range in 'Data Source' of Pivot Tables:…

    • 654 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Excel Chapter 1

    • 4708 Words
    • 19 Pages

    B) the current cell location of the insertion point as indicated by a dark border.…

    • 4708 Words
    • 19 Pages
    Satisfactory Essays
  • Good Essays

    Excel Worksheet

    • 875 Words
    • 4 Pages

    On Page 1, click at the beginning of the newsletter title. Insert an online picture from Office.com Clip Art, by searching for microscope. Insert a picture of a black and white microscope. If you cannot locate the picture, use the Insert Pictures command to insert the picture downloaded with the files provided with this project—go_w03_grader_h3_microscope.jpg. Recolor the picture by applying Blue, Accent color 1 Light. Apply a Black, Text 1 Picture Border and change the Weight to 2 1/4 pt.…

    • 875 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Week 5 Excel Assignment

    • 397 Words
    • 2 Pages

    Took assigned youth out to certain environments away from the family to aid in the progression towards self-assessment and betterment of attitude.…

    • 397 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Solar Desalination Essay

    • 376 Words
    • 2 Pages

    At the moment, the water supply in the region is varies so much that it’s not a reliable water source. With this plant station in the region, hopefully it will be a reliable water source and an efficient one for…

    • 376 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Dryuio

    • 3443 Words
    • 14 Pages

    In developing countries like ours Grid power is either inadequate or unavailable in the remote and inac move the need for long and inefficient transmission lines. If a suitable water source is available nearby, Micro-hydro is one of the reasonable and cost effective energy technologies to be considered for rural electrification. Hydroelectric systems having capacity of 100kW or smaller are considered as Micro-hydro power. It allows the utilization of hydroelectric potential of small rivers without any significant costs on dams and civil structures. It is generally of run of river type.…

    • 3443 Words
    • 14 Pages
    Better Essays
  • Good Essays

    o Construction Quality – Structural quality of the project is backed by the track records of the…

    • 454 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Keti Ltd Profile

    • 2228 Words
    • 9 Pages

    C/o. Yash Plaza (Flat System), Block No. 3, Kishore Nagar, Dist : Nanded ( M.S.)…

    • 2228 Words
    • 9 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Kachare Ki Samasya

    • 1083 Words
    • 5 Pages

    1. The subject work of 25-month duration was awarded to us on 26.08.2010. The work at site, as per work order No 1, was ordered to be commenced on 06.09.2010 and scheduled for completion in phases with phase II and III completion by 05.03.2010 and 05.10.2012 respectively. Phase –I works have already been completed.…

    • 1083 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    o Candidatesshould have B.Sc. in Electrical/ Mechanical/ Electrical & Electronics Engineeringdegreefrom Public/ GovernmentapprovedUniversity and at least 08 (eight) years of experiencein the field of Operation/Maintenance Power Plant/PowerPlant of Projectas Class-lOfflcer. Construction . Aee Limit: Up to 45 years on 0l-09-2013. as o Candidates (major in Administration shouldbe Mastersin Accounting/Finance/Business Deputy Manager with at least 04 (four) years of experiencein the field of Internal finance/accounting) (Internal Audit & in Control & InternalAudit or CA/ CMA with at least3(three)yearsof experience the field Control) (01 Post) of InternalControl & InternalAudit as class-l Officer. BasicPayTk. 33,000^ o Aee Limit: Up to 35 years on 0l-09-2013. as r Candidateshould have B.Sc. in Electrical/Mechanical/Electrical& Electronics/ Civil AssistantEngineer from Public/Government degree approved University. Engineering (Elect.-04, Mech.-03, o quota. 04 (four) postswill be filled up from Freedom-fighter Civil-03 Posts) o Age Limit: Up to 30 years (Up to 32 years Freedom-fighter's for Son/Daughter) on as BasicPavTk. 27.00010 l - 0 9 - 2 03 . 1 o Candidates in shouldhaveMSc.or BSc.(04 years) Chemistry/ Chemical Engineering. AssistantManager (Chemical)(01 Post)…

    • 588 Words
    • 3 Pages
    Satisfactory Essays
  • Best Essays

    youtube links

    • 956 Words
    • 4 Pages

    jkdhfjkahfjkhttps://www.youtube.com/watch?v= G99q6e89rJM - Telemedicine Aids Rural Areas https://www.youtube.com/watch?v=KsZLHwW3cz8 - How Electricity is Produced https://www.youtube.com/watch?v=yO1myyuFXNA - RURAL HEALTHCARE DELIVERY USING MOBILE TECHNOLOGY https://www.youtube.com/watch?v=YMb9FhHBtvc - Waste to Energy Project - Appropriate Rural Technology Institute (ARTI) hj,sdabgfdggfhsdjkgfhkrjehfuklergfhjkgfrehgf frgerhkrhhrjklgf ] rgf ft hfthy ftrghvh dgy jhj mky hju thgh dj sfgh dfz hgh js thdt h fh jtr h vhn dyj f h dtyj ra yBIO TECHNOLOGY Faculty Coordinator:- K.Karunya Kumar Contact:- 8019423593 Student Coordinator:- Ananya Sharma, Eshwar Contact:-9030887142 SNo EVENT NAME ROOM NO DAY1 DAY2 1 PAPER PRESENTATION F 105 S1,S2 2 POSTER PRESENTATION F 103 S3,S4 3 IGNITE YOUR GRAY MATTER F 108 S1,S2 S3,S4 4 TECHNICAL QUIZ F 103 S1, S2 5 BIO APPS BIOINFORMATICS LAB(CSE BLOCK 4th floor) S1,S2 6 THIRD EYE F 107 S1,S2 S3,S4 7 FIGURE IT OUT F 107 S1,S2 S3,S4 8 SPIN YOUR YARN F 109 S1,S2 S3,S4…

    • 956 Words
    • 4 Pages
    Best Essays
  • Satisfactory Essays

    Unfortunatly enviromentally hydroelectricity is not so sustainable. While producing next to no greenhouse gasses, smog, air pollution these stations require damaging habitats. First a dam must be created by re-routing the river while the dam is being built which…

    • 484 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Killing Animals

    • 277 Words
    • 2 Pages

    We are in receipt of your above referred letter regarding Final inspection of Power Transformer as per the following detail.…

    • 277 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Dams of India

    • 1408 Words
    • 6 Pages

    Dams of India have been built across many perennial rivers since the independence of India. These dams in India are a part of several multi-purpose projects to serve a variety of needs. In a multi-purpose project, a river forms a unit and a river valley is developed, by exploiting all the resources of the river. Basically, dams are built to harness the river water so that it can be utilised according to the needs. A multipurpose project is launched often for storing water for irrigation purposes, generating hydro-electricity by utilising the water stored by the dams, preventing floods and facilitating afforestation in the catchments areas of the reservoirs. Moreover, the dams also provide drinking water, using the canals for navigation in some areas and also facilitating pisciculture and recreational activities. The main multipurpose projects constituting Indian dams are the Hirakud Dam in Orissa, the Bhakra-Nangal Project in Punjab, the Damodar Valley Project in Bihar and West Bengal, the Tungabhadra Project in Andhra Pradesh and Karnataka, the Rihand Project in Uttar Pradesh.…

    • 1408 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Water Energy

    • 568 Words
    • 3 Pages

    One can tap electricity from solar or wind projects due to which one is less dependant on water for generating electricity.…

    • 568 Words
    • 3 Pages
    Good Essays