Durgapur Projects Ltd.
A REPORT ON DURGAPUR PROJECTS LTD
BY
DHRUBAJYOTI MISHRA ,

MHROM (CU)

[pic]

A REPORT ON DURGAPUR PROJECTS LTD.

Introduction:-

One of the feather of the cap of the West Bengal govt. in industrial sector is Durgapur Projects Ltd. It is mainly related to manufacturing units - from steel to power and from cement to mining machinery. Durgapur Projects Ltd, is not only increasing the govt. earning but also developing the entire society as a whole.This report on DPL is describe under following heading-

(1) Company profile
(2) Business area
(3) Contribution to the society
(4) DPL’s promise
(5) Conclusion

(1) Company profile:-

The Durgapur Projects Limited is a Government Company incorporated on 6th September, 1961 , consisting of Coke Oven Batteries, Bye-products Plant, Gas Grid Project, Thermal Power Plant and Water Works. It is under the administrative control of the Department of Power, Government of West Bengal.It also produces coke oven gas, which is being supplied to the neighbouring district of Kolkata. It produces another by-product, namely, crude coal tar. It's rich human resources of 450 highly skilled engineers and professionals besides around 5000-trained work force. A 11-member Board of Directors acts as a watchdog of the organization.

(a)Location :-

The Company’s Plants and Administrative Offices are located within 3 km from Durgapur Railway Station and 1 km from the G. T. Road.

(b)Activities :-

1. Generation of power and its distribution at 11KV in its licensed area at Durgapur and transmission of surplus power to WBSEB.

2. Production of Metallurgical Coke of Blast Furnace, Foundries etc., Coke Oven Gas as industrial fuel and Crude Coal Tar avaiable from its Recovery type of Coke Oven Batteries.

3. Treatment and distribution of water for drinking and industrial use

The Company is generating power from its six power units with an aggregate capacity of 395 M.W and

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Unit 5 Assignment 1

    • 297 Words
    • 2 Pages

    The main problem in the construction of the Dulhasti Power Plant Project is the project cost estimation and delivery. The project was based on a straight concept: Dilhasti was designed as a 390MW hydroelectric power plant to be built on Chenab River in the Doda region, The project was supposed to build a hydroelectric generating station, and string hundreds of miles of transmission lines starting near the headwaters of a system of rivers flowing onto the plain south of the mountain region.…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Nanorobot Lab

    • 1604 Words
    • 7 Pages

    The nuclear power is carried on board to supply required amount of energy required amount of energy for the operation of the…

    • 1604 Words
    • 7 Pages
    Good Essays
  • Good Essays

    Coastline Systems Consulting

    • 13250 Words
    • 53 Pages

    Project Report Contents & Format (in this order) Letter of transmittal Title page Executive Summary (Follow references on business communications.) Table of contents List of figures, illustrations, and tables Introduction Body – with the Project Management process groups: One page discussion of Initiation process plus process deliverables / outputs One-­‐two pages discussion of Planning process plus process deliverables / outputs One-­‐two paragraphs…

    • 13250 Words
    • 53 Pages
    Good Essays
  • Better Essays

    A potential investment consideration for Generation is ABB India; a market leader in power and automation, offering solutions for efficiency in power generation, electrical transmission and increased productivity. These values tie in consistently with Generation’s mission and vision. Furthermore, the company have a strong financial position with a healthy angle to capitalise on future growth trends, have a disciplined management and a strong track record.…

    • 1017 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Moreover, the company has been a major character of increasing use of renewable energy both in overseas countries and Australia. The company has enthusiastic and lots experienced workforce, with good equipped and complete range of products and services have provided with a strong foundation so that the business intend to continue to grow.…

    • 2084 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Dgfdggdfg

    • 320 Words
    • 2 Pages

    5. Processing of Bill for the Supply of Under Voltage Coil, 220V for Square Herbal Project at Pabna.…

    • 320 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    1.2.1- Maddhyapara Hard Rock Mining Company Limited (MHMCL) This company formed to accelerate the construction works of Maddhyapara mine and operate the Maddhyapara Hard Rock Mine Project of Petrobangla at Dinajpur in August 1998. The underground mine under construction at Maddhyapara targets for production of 1.6 million tons of construction rocks per annum. Until June 2000, 58% of the mine construction works were completed and the project was scheduled to complete construction works within June 2001. Currently the project authority is trying to extend the project…

    • 2587 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    The Dabhol Power Project

    • 1181 Words
    • 4 Pages

    Independent Feasibility study: Neither the central government nor the Maharashtra government undertook any kind of independent technical assistance or conducted a financial appraisal of the project. The Dabhol Power project was never subjected to a competitive tender. Enron Corporation alone was identified as being the project developers.…

    • 1181 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Enron

    • 22630 Words
    • 91 Pages

    BHEL: Bus-bar: CEA: Co-generation: GoI/GoM: GT: IPP: IRR: MSEB: NTPC: PLF: SEB: Lakh: Million: Crore: $: kWh: MW: Bharat Heavy Electricals Ltd. Point at which power is fed to the grid by a power plant Central Electricity Authority Efficient generation of power and steam simultaneously (usually in industry) Government of India / Maharashtra Gas Turbine (used for power generation) Independent Power Producer Internal Rate of Return (a measure of profitability) Maharashtra State Electricity Board National Thermal Power Corporation Plant Load Factor (capacity utilisation) State Electricity Board 100 thousand 1000 thousand 10 Million U.S. $ = 32 Rs (in 1995) one Unit of electricity Million Watts (power)…

    • 22630 Words
    • 91 Pages
    Powerful Essays
  • Good Essays

    Ta Energy Case Study

    • 1790 Words
    • 8 Pages

    Long-term stable customer was a key for the success of the project. Ayhan made a contract with RG Holding to sell 19MW for 10 years. From the purchase contract of RG Holding, he could finance in total $32million from bank loans. The supply of gas and oil was also important to run the power plant. Ayhan made 20 years’ contracts with BOTAS and British Petroleum for the supply at fixed prices. For the opertation of the plant, he made an agreement with International Power Corporation for three years.…

    • 1790 Words
    • 8 Pages
    Good Essays
  • Good Essays

    Madhya Bhotekoshi Jalavidhyut Company Limited (MBJCL) is a subsidiary company of Chilime, registered as public company in july 2010. MBJCL has planned to develop Middle Bhotekoshi Hydroelectric Project (MBKHEP) with an installed capacity of 102 MW in Sindhupalchowk district of Central Development Region. The Madhya Bhotekoshi Jalavidhyut Company Limited (MBJCL) is a public limited company established in 2010 AD to harness country’s hydropower potential. The company has planned to develop Madhya Bhotekoshi Jalavidhyut Company Limited in the easily accessible area.…

    • 778 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Kdpp Report

    • 5442 Words
    • 22 Pages

    We express our heartfelt gratitude to Thampirajan C.R, Project Manager who allowed us to use the facilities in KDPP, Nallalam…

    • 5442 Words
    • 22 Pages
    Powerful Essays
  • Powerful Essays

    IEE Jaisalmer Drainage

    • 14986 Words
    • 93 Pages

    Government of Rajasthan Asian Development Bank Technical Assistance Project Number: 40031 India: Rajasthan Urban Sector Development Investment Program (RUSDIP) INITIAL ENVIRONMENTAL EXAMINATION (DRAFT) JAISALMER: URBAN DRAINAGE SUBPROJECT FEBRUARY 2006 CONTENTS I. INTRODUCTION ...................................................................................................... 4 A. Purpose of the report ............................................................................................................................…

    • 14986 Words
    • 93 Pages
    Powerful Essays
  • Satisfactory Essays

    Ajay

    • 939 Words
    • 4 Pages

    18. The Durgapur Steel Plant in West Bengal was built with the collaboration of _____ ?…

    • 939 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    “To provide reliable quality electrical power to the entire nation at internationally competitive prices effectively and efficiently through a meaningful partnership with skilled and motivated employees using appropriate state-of-the-art technology for the socio-economic development of the country in an economically sustainable manner while meeting acceptable environment standards and a satisfactory rate of return on investments”…

    • 1943 Words
    • 8 Pages
    Powerful Essays

Related Topics