Preview

Design of a New Gas Turbine-Generator System

Powerful Essays
Open Document
Open Document
1421 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Design of a New Gas Turbine-Generator System
1. INTRODUCTION :

Gas Turbine-Generator system has proximity to zero level due to absence of condenser. Therefore, Generator should have Terminal Bushings at the top of the Stator Frame. This avoids digging of tunnel / trench for routing Bus Duct and also avoids accumulation of gases from safety point of view. It was decided to develop a module THRI 108/44 for application with Gas Turbine. 2. DESIGN CHALLENGES : Since, bar type design of THRI 108/44 module for GTG application is not available. Hence the same had to be designed afresh taking the following major design challenges into consideration:

2.1. Shifting Terminal bushings for tapping power from bottom to top.

2.2. Location, number and size of coolers and cooler ducts in stator Frame to accommodate connections between Bus Bar and Terminal Bushings.

2.3. Proven ventilation scheme inside stator frame for cooling of stator core, windings and its overhangs.

2.4. Provision of static excitation system by providing slip ring shaft.

2.5. Position of Barring Gear on Exciter End (non drive end) requiring Slip Ring shaft rotor having a matching coupling with generator rotor on one side and barring gear on other side.

2.6. Provision of routing of piping emanating from bottom of stator and end shield in the foundation.

2.7. Routing of connections between bus bar and terminal bushings maintaining required electrical connections

2.8. Use of existing components as far as possible for inventory and variety reduction.

2.9. Mechanical and Electrical calculations for soundness of design.

3. ACTION PLAN :

3.1. Identification of assemblies for fresh designing - 34 numbers design groups out of 125 groups were identified to be designed afresh. (Annexure-1)

3.2. Carrying out Exhaustive Electromagnetic, Mechanical, Ventilation & Heat Transfer calculations.

3.3. Development of detailed design documents, scrutiny by technology, incorporating the changes suggested and release of

You May Also Find These Documents Helpful

  • Good Essays

    Keystone Case Study

    • 457 Words
    • 2 Pages

    It is important that documentation and tracing of the program to product specifications have been done. Lastly the detailed program design need to have been reviewed for high risk development issues.…

    • 457 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Hvac

    • 673 Words
    • 3 Pages

    Water cooled Condenser Classification based on construction Tube in tube condensers Small tube in tube condensers Straight tube in tube condensers Shell and water cooled condensers Vertical shell and coil water cooled condensers…

    • 673 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Warren Sports

    • 1334 Words
    • 6 Pages

    Clarkson, J. & Eckert, C. (2005). Design Process Improvement: A Review of Current Practice. Springer.…

    • 1334 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Solve a Problem Paper

    • 1187 Words
    • 5 Pages

    After studying the situation the factory location routes the wiring harnesses between the cylinder head and the firewall on the…

    • 1187 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    * Design brief: designed upon the response of consumers, engineering team, national and international market place…

    • 570 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Resume Quest

    • 841 Words
    • 4 Pages

     Provided structure reports in preparation for transition from prototype to production and ran production…

    • 841 Words
    • 4 Pages
    Powerful Essays
  • Powerful Essays

    MD-90

    • 4346 Words
    • 24 Pages

    turbofan (V2500) engine installatioils are considered. Jlighlights of the UHB Technology Readincss Program are provided to identify thc broad technology base established for introduction of UHB engine technology. Technical aspects of…

    • 4346 Words
    • 24 Pages
    Powerful Essays
  • Satisfactory Essays

    Nuclear Regulatory Commission (NRC) Generic Letter 89-13 requires periodic testing of all raw-water-cooled safety-related heat exchangers to ensure that the General Design Criteria of 10 CFR Part 50 are being met. Specifically, GL 89-13 addresses the requirements of GDC 44--Cooling Water, GDC 45--Inspection of Cooling Water System, and GDC 46--Testing of Cooling Water System. The heat exchangers associated with the Emergency Diesel Generators (EDG) at most nuclear power plants are raw-water cooled and safety-related, and therefore, fall under the requirements of GL 89-13. Whereas most of the larger safety-related heat exchangers can be tested and the resulting data reduced to an easily understood baseline value such as fouling factor, the EDG heat exchangers usually can not be tested in this manner due to lack of instrumentation, complex piping configurations, and automatic temperature-sensing flow control valves. The operational questions posed by GL 89-13 could be resolved readily if the EDG heat exchangers could be tested exactly at the conditions required or postulated by the most limiting accident scenario. Some of these parameters, such as kilowatt loading, can be easily attained; however, certain parameters such as the cooling water inlet temperature, or the external ambient air temperature may not be controllable. Such is the case with the Emergency Diesel Generator heat exchangers at Millstone Point Unit 1 (MP1). This paper details a test procedure that determined…

    • 5157 Words
    • 21 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Multi unit of Wartsila gas engine power plant configuration improve reliability in case of breakdown or maintenance (less power loose).…

    • 328 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The heat produced due to internal combustion, drives the engine. But some parts of this heat raise the temperature of different parts of the engine. High temperature may cause permanent damage to the machine. Hence, it is essential to maintain the overall temperature of the engine to a tolerable level. Cooling system of diesel power station does exactly so. The cooling system requires a water source, water source, water pump and cooling towers. The pump circulates water through cylinder and head jacket. The water takes away heat from the engine and it becomes hot. The hot water is cooled by cooling towers and is re-circulated for cooling.…

    • 463 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Reaction Turbine

    • 1279 Words
    • 6 Pages

    Turbines are machines which develop torque and shaft power as a result of momentum changes in the fluid that flows through them.For the fluid to provide worthwhile momentum change there must be a significant pressure difference between inlet and outlet. Sources of pressurized gas include previously compressed (and possibly heated) gas.…

    • 1279 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Quasi Turbine

    • 3035 Words
    • 13 Pages

    Quasi turbine is a zero vibration continuous combustion rotary engine having four faces articulated rotor with a free and accessible centre rotating without vibration nor dead time and producing a strong torque at low rpm under a variety of modes and fuels. The quasi turbine is also an optimization theory for extremely compact efficient engine concept.…

    • 3035 Words
    • 13 Pages
    Powerful Essays
  • Good Essays

    Optimization of secondary air layout and vents flow to reduce the head of the secondary air pressure of fans.…

    • 319 Words
    • 1 Page
    Good Essays
  • Satisfactory Essays

    Event Proposal

    • 265 Words
    • 2 Pages

    A. Discussion Round: (DATE: duration of development of proposal, discussion and consultation with joint committee)…

    • 265 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Epc of Thermal Power Plant

    • 4561 Words
    • 19 Pages

    The forced draft fans (2 per unit – 50% capacity each) are designed for handling secondary air for the boiler. These fans are located at ‘0’ M level near the PA fan…

    • 4561 Words
    • 19 Pages
    Powerful Essays