Preview

Denver airport study

Good Essays
Open Document
Open Document
3889 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Denver airport study
Case studies at three large, software product companies show the benefits and pitfalls of integrating agile methods with stagegate management models. 0740-7459/05/$20.00 © 2005 IEEE

he project manager enters the room where the pilot agile development team sits. “We have to add a new feature to our next release,” he says. “Can you please put it on the list?”
“Yes, of course,” a team member replies. “Just let us know which feature you want us to postpone in its place.”
The manager gets confused and a little annoyed. “What’s happening? When we used our traditional development methodology, you could squeeze in

T

all the new features we needed. I feel as though
I’m no longer in control here.”
This fictitious dialogue captures the cultural changes and different management and engineering viewpoints we encountered in a study of three large software development organizations that started using agile methods.
We undertook the study in response to questions raised at an industrial seminar on
Extreme Programming (XP)1,2 and agile development methods held in 2003. The Software
Engineering and Research Group at Lund University sponsored the seminar, which included representatives from more than 20 different software companies. The representatives were extremely interested in agile development, but they weren’t sure whether or how it might coexist with their existing project management models. Their interest prompted us to study the fea-

sibility of applying agile methods in the context of large software development projects using stage-gate project management models
(see the related sidebar). The results showed not only the feasibility but also the benefits of this approach as well as issues that must be addressed to ensure its success.

Case studies’ scope
The software engineering community has generally viewed agile methods favorably. The focus on simplicity, programmers, and products empowers the technical staff and gives



References: 1. K. Beck, “Embracing Change with Extreme Programming,” Computer, Oct. 1999, pp. 70–77. 2. K. Beck, Extreme Programming Explained: Embrace Change, Addison-Wesley, 1999. 3. C. Wallin, F. Ekdahl, and S. Larsson, “Integrating Business and Software Development Models,” IEEE Software, Nov./Dec. 2002, pp. 28–33.

You May Also Find These Documents Helpful

  • Best Essays

    INFS1602 Assignment A

    • 3808 Words
    • 16 Pages

    2. Amir Bonakdar, T. W. (2013). Transformative Influence of Business Processes on the Business Model: Classifying the State of the Practice in the Software Industry. Hawaii: Hawaii International Conference on System Sciences.…

    • 3808 Words
    • 16 Pages
    Best Essays
  • Better Essays

    Denver Airport Com Plan

    • 2102 Words
    • 9 Pages

    7. Origin-Destination Survey of Airline Passenger Traffic, Domestic U.S. Department of Transportation/Air Transport Association of America, 1993…

    • 2102 Words
    • 9 Pages
    Better Essays
  • Satisfactory Essays

    Braude, E. J., & Bernstein, M. E. (2011). Software Engineering, Modern Approaches (2nd ed.). :…

    • 516 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    References: Iseger, M. (2010, July 23). Domain-specific modeling for generative software development. Retrieved from http://www.developerfusion.com/article/84844/domainspecific-modeling-for-generative-software-development/…

    • 858 Words
    • 4 Pages
    Good Essays
  • Best Essays

    Haynes, Wendy, and Andrew Whipple. "Transportation Megaprojects: Comparing Project Management and Oversight Approaches." Public Manager 38.2 (2009): 72-77. Print.…

    • 2235 Words
    • 9 Pages
    Best Essays
  • Satisfactory Essays

    Logan Airport: Case Study

    • 256 Words
    • 2 Pages

    In the case, we learned that adverse weather conditions are primary cause of delays at Logan Airport. When weather conditions deteriorate, or when winds from the northwest become moderately strong, Logan's capacity drops from three runways (where one runway handles both arrivals and departures, one runway only departures, and one runway only arrivals) to two (where two runways handle both arrivals and departures.) Arrival capacity in the former case averages around 60 planes an hour, and in the latter case (a situation that occurs on average 30 days a year), 45 planes an hour. When weather conditions are particularly severe (a situation that occurs on average 10 days a year), only one runway for both arrivals and departures is in operation at Logan, and total arrival capacity drops to 30 operations an hour.…

    • 256 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    3. Demand-management methods: such as peak-period pricing, incentives to divert aircraft to non-peak hours, and tradable permits of 15-minute peak-period slots.…

    • 2305 Words
    • 7 Pages
    Better Essays
  • Good Essays

    In software engineering, one can find various life cycle models. Some examples include the waterfall model, agile processes, and iterative and incremental models. Research at least five (5) current and representative life cycle models.…

    • 677 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Contents Rapidly changing market conditions are requiring companies to shorten delivery cycles and become more responsive to customer expectations. Agile development methodologies are leading the way, helping software development teams adjust to the new economy. Agile challenges our notion of software engineering best practices, project management methodology, and how we lead our teams. The Agile movement impacts every role on a project team differently and creates opportunities to learn new skills and develop new ways of working together. Agile development is having a significant impact on the Business Analyst community. Agile introduces a significant…

    • 2959 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    When asked about your experience at the airport most would reply by saying “It is dull and boring” or “a tortuous large amount of time spent waiting”. However, words used to describe the Denver International Airport are much different.…

    • 750 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Agile V. Waterfall

    • 1925 Words
    • 8 Pages

    More and more organizations are starting to see the advantages of Agile now and are questioning older methods almost entirely because of the fast-paced business world of the twenty-first century. Agile allows an organization to respond to that change more quickly without sacrificing quality work or customer satisfaction. Waterfall, on the other hand, with its precise planning can offer better time management and money savings. In a fast-paced society where the time it takes to bring a product to market could mean the difference between success and failure, Agile is making its way into more and more organizations everyday. And, everyday more and more of these organizations are struggling with the change that is required to adopt Agile…

    • 1925 Words
    • 8 Pages
    Powerful Essays
  • Powerful Essays

    Agile Methodology

    • 2132 Words
    • 9 Pages

    Agile methodology is an approach to the project management which help to respond to the unpredictability of building software through incremental, iterative work cadences, known as sprints. This methodology was developed to deal with situation where the waterfall model fails. The biggest drawback of waterfall model is that it assumes that every requirement of the project can be identified before any design or coding occurs. This may always be applicable for the development of a automobile on an assembly line, in which each piece is added in sequential phases. However it may or may not be applicable for software development. For example, for a BAU (Business as Usual) projects where the software is already in use for a long time, waterfall model is the best method to implement any changes requests because amount of uncertainly is very less compared to developing a new product. However for developing brand new software, waterfall model is not an ideal choice as the amount of uncertainty in terms of requirement and user quality expectation. It might be the case that end product is not exactly what user has expected due to mismatch of requirement understanding between user and developer. It might also be the case that a team might have built the software it was asked to build, but, in the time it took to create, business realities have changed so dramatically that the product is irrelevant. In that scenario, a company has spent time and money to create software that no one wants.…

    • 2132 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Outsourcing

    • 2746 Words
    • 11 Pages

    4. Roger S. Pressman, Software Engineering: A Practitioner 's Approach (McGraw Hill, New York, 2008), 5.…

    • 2746 Words
    • 11 Pages
    Powerful Essays
  • Powerful Essays

    ƒÜ D.E.AVISON and G.FITZGRALD, 2000, Information Systems Development Methodologies Techniques and Tools, 2nd Edition, The McGran-Hill Companies…

    • 2547 Words
    • 10 Pages
    Powerful Essays
  • Better Essays

    Lincoln Municipal Airport’s current site was the result of a competition between three different potential airfield sites within Lincoln (McKEE, 2013). In April 1928, the site went to vote and 160 acres north of Capital Beach were purchased (McKEE, 2013). The voters also gave the go-ahead to build an airport (McKEE, 2013). In the same year, United Airlines made the first flight into the newly christened airport (McKEE, 2013).…

    • 828 Words
    • 4 Pages
    Better Essays