Bottlenecks in a process
In week one I determined the need for better processing with vendor selection at PetSmart. As a Project Manager over Salon Operations, I know that there are several processes in the timeline and flow chart found during the process analysis that could be improved. One of those potential improvements is the elimination or reduction of bottlenecks, which are discussed below along with the TOC or Theory of Constraints by Eli Goldratt. (Chase, Jacobs, & Aquilano, 2006, pg. 721)
Bottlenecks
“A bottleneck is defined as any resource whose capacity is less than the demand placed upon it” (Chase, Jacobs, & Aquilano, 2006, pg. 725), when dealing with vendors many items can cause an issue or constraint on the resource. Dr. Eli Goldratt stated that businesses do not do as good a job at controlling their resources and stock levels. He solved the problem by using OPT or optimized production technology, by doing this he was able to identify nine rules of production scheduling that maximize production by identifying and reducing bottlenecks. During my evaluation from the first three weeks I have encountered two definite bottleneck situations. The first being the email response rate, if I do not answer all the emails in a given day from the vendors I get backed up for the following day missing key information that could have started a process the day prior, pointing out Goldratt’s rule number four which states that “an hour lost at a bottleneck is an hour lost for the entire system”(Chase, Jacobs, & Aquilano, 2006, pg. 721). Therefore I understand that I am losing a day for the entire testing process by letting my emails bottleneck. Secondly, I see a bottleneck when trying to set up cross-functional team involvement. If I wait or do not set up a physical meeting to discuss the item and approve conditionally face-to-face I lose time trying to rally the team’s thoughts and compile and then

You May Also Find These Documents Helpful

  • Satisfactory Essays

    As a way of eliminate the wastage of time through performing of non-core tasks, we have introduced a CCT KPI of 4 hours a week, which translates into at least three 20 minute appointments per day. It is however, up to the discretion of the sales person how this is achieved, and can be distributed however works best throughout the week. This KPI is important, as it removes the excuses by setting an essentially unnegotiable benchmark.…

    • 468 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Accounting Costs

    • 690 Words
    • 3 Pages

    Find ways to increase the capacity of the bottleneck, ensure there is minimal lost time at the bottleneck due to breakdowns and set-ups, focus business process improvement efforts on the bottleneck.…

    • 690 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    The Goal

    • 2517 Words
    • 11 Pages

    The “goal” is to make money and anything that assists in doing this is productive, while anything that hinders this is a bottleneck. The Goal goes on to identify bottlenecks (constraints) in the manufacturing process and how identifying them helps reduce impact and allows for controlling the flow of materials.…

    • 2517 Words
    • 11 Pages
    Powerful Essays
  • Better Essays

    Supply chain efficiency is measured by how quickly inventory turns over and weeks of supply. If a bottleneck exists in the supply chain, such as the packaging and shipping of the inventory, the company could not handle the demand of inventory coming in. Thus, the capacity of shipping resources would be less than the demand of inventory and a bottleneck is created (Chase, Jacobs, & Aquilano, 2006). This is true for Riordan. The plant in Hanghzou, China experienced problems with shipping…

    • 1307 Words
    • 6 Pages
    Better Essays
  • Good Essays

    Nissan Case Study

    • 524 Words
    • 2 Pages

    The theory of constraints (TOC) can be described as an application designed to “solve business problems in a particularly practical and effective manner” (Introduction to the Theory of Constraints). The TOC is a scientific effort that focuses energy and attention to system constraint. In simple terms, the TOC is the wisdom that restricts or limits any company’s ability to accomplish their goals. There are five steps of the TOC process; the first step within the process is to identify constraints. In this step, it is “strengthening any link of a chain (apart from the weakest) is a waste of time and energy” (The Five Focusing Steps (POOGI)). Second is to develop a plan to overcome the constraint(s) identified in step one. Here the output of the identified constraint governs the output of the entire organiztion, so it is highly important to utilize the constraint instead of getting more. “We should first learn to use the resources that we already have more efficiently” (The Five Focusing Steps (POOGI)). Step three involves focusing on the resources for accomplishing step two. Also, the orgazation should not produce more than the constraint can handle. Forth is to reduce said effects of the constraint by relieving work or expanding the capability. Finally in step five, once one set of constraints are overcome, you may start back at step one for new constraints. Within the terms of TOC, the market is constantly, or at least tactically a leverage point. Nissan should focus on the quality, meeting and exceeding the market requirements. Found within most markets are “high-quality products are highly competitive products. A focus on quality translates to a focus on throughput” (Newbold, 1998). Manufacturers need to identify and eliminate the bottlenecks to…

    • 524 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Five Star Tools is a small family-owned firm that manufactures diamond coated cutting tools used by jewelers. The production line consists of three major processes: the steel ‘blanks’ are first cut to size and then sent through a chemical bath before the final step in which the prepared tools are diamond-coated and sharpened. The coating and sharpening process requires highly skilled workers, expensive equipment, and utilizes a proprietary process, which simultaneously coats and sharpens the blade of each tool. This stage of production is currently at capacity and causing delays in the completion and delivery of customer orders. Management has identified the final stage of production as the bottleneck, or the binding constraint of production. Delayed orders and eschewed business could be damaging to the firm’s reputation and result in loss of market share to competitors. Either the constraint must be loosened or the firm must turn down business beyond the scope of its current production capacity. Loss of market share and a declining reputation will likely have a negative impact on the firm’s long-term profitability.…

    • 771 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    The Goal Take Aways

    • 279 Words
    • 2 Pages

    9: The overwork of the non-bottlenecks will increase the inventory and decrease the producing efficiency.…

    • 279 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Littlefield Labs Report

    • 548 Words
    • 3 Pages

    1. Step 1 is the bottleneck because it has the largest average queue size compare to step 2, 3 or 4. Even though we purchased 5 machines for Step 1, the utilization rate were around 80% or 90% when demand was high. Although Step 2 and 4 do their jobs in the station, they only take 2.1 hours which is still low compare to 5.3 hours in Step 1.…

    • 548 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Response: The Theory of Constraints focuses on making organizational decisions in situations in which constraints exist. The authors illustrate the Theory of Constraints (TOC) in production management. They use the story of "The Goal" to focus on solving problems such as bottlenecks, scheduling, and inventory reduction. To more accurately put it, a constraint is anything in an organization that limits it from moving toward or achieving its goal (p.43). Of course, this assumes that an appropriate goal has been defined.…

    • 1236 Words
    • 5 Pages
    Better Essays
  • Good Essays

    From the calculations on the above table, it is clear to see that the boring machine center is the bottleneck since that is the limiting factor to production. The bottleneck is “the department, workstation, or operation that limits the flow of product through the production system. This department restricts the flow of product from upstream departments and starves downstream departments.” (Vanderembse, 2013,…

    • 783 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Bottlenecks

    • 356 Words
    • 2 Pages

    Getting up and ready for work is a daily process. This process can have many bottlenecks that will hinder the process. After collecting two weeks of data and analyzing the flowchart presented in week one, I could identify the main bottleneck. A bottleneck is defined as “any resource whose capacity is less than the demand placed on it. A bottle neck is a constraint within the system that limits throughput” (Chase, Jacobs, & Aquilano, 2006, p. 725).…

    • 356 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    I notice you used a source of reference to define bottlenecks and it is different than our course of study. However, I am not sure if you understand the concept of bottleneck correctly as evidence discussed in your paper. Except for you mentioning heart rate and vital signs being abnormal and these factors can limit the capacity of your workout and there is limited discussion about this bottleneck. (-3) Consider using a value-added analysis (focused on eliminating the non–value-adding activities), you might be able to reduce the workout time and maintain an acceptable heart rate for your activities. I would like to have seen you support your perspectives of the process and support it with theoretical concepts from the assigned reading where necessary. (-.25)…

    • 544 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Cheat Sheet

    • 1557 Words
    • 7 Pages

    Cycle time: Bottleneck| Cycle time = 1/Capacity rate | | Inventory = Throughput Rate x Flow Time | Little’s Law: I = R x T | Inventory Turns (IT) = 1 / Flow time (T) = R / I |…

    • 1557 Words
    • 7 Pages
    Good Essays
  • Good Essays

    Cranberry and Berries

    • 1276 Words
    • 6 Pages

    1. In the current flow of the process, identify the bottleneck areas. What recommendations, both short-term and long-term, would you make to solve the bottleneck problem?…

    • 1276 Words
    • 6 Pages
    Good Essays
  • Good Essays

    MBA 731 H1FF Brief 5

    • 597 Words
    • 2 Pages

    References: Krajewski, L. J., Ritzman, L. P., & Malhotra, M. K. (n.d.). Operations Management, Process and Supply Chains (Tenth ed.). N.p.: Pearson.…

    • 597 Words
    • 2 Pages
    Good Essays

Related Topics