A Report On Summer Training

Undertaken at Hindustan Zinc Limited, Debari

CONTENTS
 About the Company  History of the Company  Sections in HZL  Power requirement  Organizational Chart  Basic Processes Done  Mining  Roasting  Leaching  Zinc Electrolysis  Melting & Ingots Formation  Zinc & Its Uses  Project- SWITCHYARD

Zinc Smelter Debari is a Hydrometallurgical zinc smelter situated at Debari, about 13 kms from Udaipur, in Rajasthan, India. The primary product of Debari is High Grade (HG) zinc and it also recovers cadmium and Sulphuric Acid as by-product.

History Of HZL, Debari
Zinc Smelter Debari was commissioned in the year 1968 with an initial production capacity of 18,000 tonnes per annum of zinc. In the past several years the capacity of the smelter has been expanded five folds to its current production capacity of 88,000 tonnes per annum of zinc.

Sections in HZL
The plant has three roasting section, one leaching & purification section, one electrolysis & one melting & casting sections.

Power Requirement
Zinc Smelter Debari also has 14.81 MW captive power plants to supply the power requirements for its metallurgical operations; it also sources additional power requirements from our captive thermal power plants located at Chanderiya and at Zawar.

Raw Material Supplies:(a). Zawar Mines (b). Agucha Mines (c). Rajpura Dariba Mines (d). Sindesar Khurd All in Rajasthan as shown in the map above: -

Power Consumption: - 50 to 52 MW per day.

Product Buyers:(a). Tata
(b). Bhel

(c). Steel Companies Note: - Zinc produced is 99.995% pure.

Basic Processes Done
Mining Roasting Leaching

Zinc Ingots

Melting

Electrolysis

Mining
Mining is the process of extracting valuable minerals or other geological materials from the earth, usually from an ore body, vein or seam. Materials recovered by mining include metals like Zn, Fe & coal, Diamond etc. • Above shown is Rampura Agucha mines.

Roasting Process

You May Also Find These Documents Helpful

  • Satisfactory Essays

    SOC10134lbcassandram

    • 1447 Words
    • 4 Pages

    Geological, engineering and economic work necessary to ensure profitable use of mines, forests, water and minerals and can also range from mineral prospecting or drilling for petroleum, to building a mine or pipeline.…

    • 1447 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Minning

    • 1123 Words
    • 5 Pages

    “(19,312 km) of rivers and streams in the United States are polluted by abandoned and current mining operations” (Environmental Science 3). However, this is only part of the entire effect of mining on the environment. Mining affects the environment and humans in many different ways. It may be necessary, but even though mining is the only known way to extract some resources, it is doing more harm than good by causing pollution, disfiguring the land, creating habitat loss, and it often, if not always, results in long term damages to the environment.…

    • 1123 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Rate Factors

    • 883 Words
    • 8 Pages

    Chemical Kinetics Factors Affecting Reaction Rate OVERVIEW Chemical reactions occur at different rates. In this experiment you will consider some of the key factors that influence the rate of a reaction: ƒ ƒ ƒ ƒ nature of reactants - particle size temperature concentration catalysts According to the collision theory, the rate of a reaction depends on the frequency of collisions between reacting particles.…

    • 883 Words
    • 8 Pages
    Good Essays
  • Good Essays

    Arcelormittal Case Study

    • 987 Words
    • 4 Pages

    In addition, ArcelorMittal will invest around PLN 200 million in its Krakow-based plant for the relining of the blast furnace 05, which is coming to the end of its life cycle in mid 2016. Once the relining is complete, it will increase Krakow's hot-rolling mill capacity by 900,000 tons per annum, while the hot dip galvanizing capacity will increase by 400,000 tons per annum. Thus, it is evident that ArcelorMittal is taking the right steps to address the opportunity in the end…

    • 987 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    The company was started in the year 1987 by a budding entrepreneur Mr. Anil Suri who by qualification is an engineer. Completed his engineering from PEC (Punjab Engineering College Chandigarh) in electrical stream and got a job in the state government department but he soon realized that his interests are different from this. So in the year 1987 he started this little venture with involvement of the family members. After all these years the unit is still in manufacturing and doing well in the competitive market with many close competitors like Nair Electrodes the biggest of all.…

    • 1498 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    This paper is prepared in order to explain how best to get prepared, what actions to be taken for “Developing Thermal Power Plants Service Business Plan" in Turkey and adjacent Countries. The plan could be implemented in 3Q07, however implementation of the specified measures is suggested for any time period.…

    • 1452 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Coal Company Zarechnaya – is the part of MPO Kuzbass. Coal Company Zarechnaya manages several coal mines, affiliates and charities. Zarechnaya includes 6 mines (3 under construction and 3 operating), concentrating plant, and a number of subsidiary enterprises. Potential coal reserves - 1986 mln tones. Layer thickness varies from 1 to 5,3 meters. Today enterprises of CC Zarechnaya mine and wash Gas coal, Flame coal. In the short-term company is anticipated to start mining and concentrating Fat coal, Gas Fat coal. Coal Company Zarechnaya exports more than 85% of the end product. The consumers are: chemical-recovery, energy and other enterprises in more than 12 countries including Spain, The United Kingdom, the Netherlands, etc. Altogether CC Zarechnaya is a “closed-circle” company, which manages prospection and production of coal, it 's washing, transportation and final sale to the customer.…

    • 2701 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    establish in various biotic and abiotic stress conditions, high oil content (30-42% in seed), multiple uses including lubricant and illumination etc. Continuing efforts for bringing out various technical bulletins on various TBOs i.e. Neem, Jojoba, Wild apricot etc., the Board has…

    • 3292 Words
    • 14 Pages
    Good Essays
  • Powerful Essays

    Ethical issue in industry

    • 762 Words
    • 4 Pages

    - Zinc buffer stocks were stored everywhere even blocking the walkways and emergency exits. Furthermore, the plant was a dangerous place with many overused and overheated machinery which may explore easily. And the management refused to stop operating the plant even getting knowledge about the unsound roof which finally collapsed.…

    • 762 Words
    • 4 Pages
    Powerful Essays
  • Satisfactory Essays

    Onsite Training Programs (For Power Generating Companies) Short term Programs for Engineering Colleges Summer Internship Programs for Engineers Synergem Power Training Institute India www.synergemindia.com PGTP For Fresh Graduates One year Post Graduation Training Program in Thermal Power Plant Engineering is designed as per mandatory requirement under Training and Development policy (under Indian Electricity Rules, 1981).  One year program comprises classroom training along with regular plant visits which are conducted at nearby thermal power stations.  Classroom training is well supported by computer based training programs and 210 MW PC based simulator training.…

    • 604 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    coal linkage

    • 816 Words
    • 4 Pages

    Central Coalfields (CCL): These comprise the Barka Sayal, Argada, North Karanpura, Rajhara, Piparwar, Rajrappa, Kuju, Hazaribagh, Bokaro & Kargali, Dhori and Kathara mines.…

    • 816 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    The project was employed in two phases with phase 1 successfully completed meeting all the requirements. Currently the phase 2 of the project is in progress. The project is running smoothly & is currently both financially and schedule wise on track. I was deployed in the Rectifier substation & 220 kV switch yard which was one of the most critical links in the smelting process. The completion of the project was of utmost criticality…

    • 1485 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    doha west power station

    • 707 Words
    • 3 Pages

    The first power generating unit was synchronized on 08.06.82 the last eighth unit was synchronized on 09.07.84. All 8 units had successfully operated for nearly 90000 hours since initial commissioning each generating more than 15500000 MWH without any major constraints. The first distiller started production in july'83 and commissioning of all 16 distillers were completed by January'85. The condition &performance in all 8 power generating units and 16 distillation units are considered excellent even after 16-17 years of operation without any capacity reduction. The turbo-generators also supplied by M/s. MHI/MELOC (Mitsubishi Electric Corporation) of Japan are of double star, Hydrogen cooled type capable of generating 300 MW with a terminal voltage of 21 V. the generated power is pumped into the national grid net-work through 6 over head line feeders after stepping up to a voltage of 275 KV which is another novelty for Kuwait. 300 KV system of our station is connected with the 145 KV system at our end through 3 No. of coupling transformers of (250 MVA each). This 145 KV system is connected the with grid through 3 Nos. of cable feeders to DEPS.…

    • 707 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    3.1 Materials / Equipments - the exact technical specifications, quantities and source of method of preparation for all materials used should be given. Specifically built equipment used in the study must be described and the description accompanied…

    • 254 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The company has 4 plants - located at Hosur and Mysore in South India, in Himachal Pradesh, North India and one at Indonesia. The company has a production capacity of 2.5 million units a year.…