Cost Control and Cost Planning in Construction Industry
Introduction

Profit is always the main consideration for a company to make decision and it is the main reason to run a project. But how we can gain profit by running project?

A proper planning is always help to reduce the risk on running project. There are a lot of tools or methods offer by project management, cost planning and control is a very important tool for project management.

A good cost planning is because it can help on forecasting the expenses that need to spend for the project. And cost control will minimize the wastage during execution of project.

This report will emphasize the objectives, benefits, methods and other matters on construction cost planning and cost control.

Cost Planning

Cost planning normally will conduct in the prior stages of construction project.
After the owner has allocated the budget, cost planning will determine whether the project will over budget. If yes, the project is not feasible in its current state and should be re-plan or re-schedule to reduce costs.

The general advantages of cost planning include:


The tender sum is more likely equate with the approximate estimates.



Reduce the unnecessary quantities being required



Cost effectiveness and a value for money design are more likely to be achieved 

A balanced distribution of expenditure is likely to produce a more rational design 

Cost considerations are more likely to be taken into account because of the greater involvement of the quantity surveyor during design process. This will result in the BQ preparation becoming easier, since the quantity surveyor will be more familiar with the project and have a greater understanding of what the designer is attempting to achieve.



The amount of pretender analysis by the architect and quantity surveyor should enable more decisions to be taken earlier, resulting in a smoother running of the project on site.



Cost planning provides a basis for

You May Also Find These Documents Helpful

  • Good Essays

    The objective is to manage and control the project easily, systamatically and professionally. The project stages, schedule, responsible people and departments can be difined clearly and is convinent to trace each activies and stages, with a whole picture of the project.…

    • 3472 Words
    • 29 Pages
    Good Essays
  • Good Essays

    1.3 Explain the project-planning methodologies appropriate to the types of projects run and the tools that can be used to assist project planning and control…

    • 1213 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Burke, R. (2006). Project Management - Planning and Control Techniques (5th ed.). www.burkepublsihing.com: Burke Publishing.…

    • 13536 Words
    • 144 Pages
    Powerful Essays
  • Satisfactory Essays

    An increased resources and materials can cause issues that will affect the project severely if not monitored and addressed in time. The probability may be low, but can change due to several economic and/or political issues that may arise. If such an event happens, it can easily have a ripple effect throughout the project. It can cause the budget to be derailed, which can cause the project be put on hold until more affordable materials can be acquired, or the project as a whole not come to completion. To address this issue, the budget and the economic situation must be closely monitored.…

    • 362 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Pm 586 Week 4 Essay

    • 415 Words
    • 2 Pages

    The total budget for the project is $2,634,172. This amount is about $100,000 less than the current allotted amount of $2,750,000, showing that the project is currently within budget.…

    • 415 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Increased cost and time are a major concern in this project, the probability is low however, if it does occur the impact will be quite high, because it will definitely cause an overrun in the budget and or missed schedule. This risk can be mitigated by closely monitoring the budget against the actual cost and making sure that the project is always within the allocated cost and on schedule.…

    • 311 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    By using different type of project management tools you can determined which tools and requirement that will be needed for the project. Project management has many tools available to help with managing projects. The two that are talked about in the chapter are these; Program Evaluation and Review Technique (PERT) and Gantt charts, they help managers schedule and monitor the activities involved in large projects, such as implementation of a large-scale information system. There are also software solutions that may be used for project management.…

    • 911 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Management

    • 1126 Words
    • 4 Pages

    Different project management approaches are designed for easily carrying out the different process in a planned way for accomplishing all the requirements. Each approach have key feature of its own which keeps the activities in sync with the project plan. Some…

    • 1126 Words
    • 4 Pages
    Powerful Essays
  • Better Essays

    careful risk planning greatly mitigates the impact it can have. All projects carry some risk. The…

    • 1529 Words
    • 9 Pages
    Better Essays
  • Satisfactory Essays

    Busn 6110

    • 350 Words
    • 2 Pages

    The Planning process corresponds to the “plan” component. The Executing process corresponds to the “do” component. The Monitoring and Controlling process corresponds to the “check-act” component. The Initiating process starts the “plan-do-act-check” cycles. The Closing process ends them. It is the integrative nature of project management which requires…

    • 350 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Project management has found wide acceptance in industry It has many applications outside of construction…

    • 999 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    Cost and Schedule are the most important elements of a successful project management. The USAMMA Scheduling & Cost Controls offers methods…

    • 1428 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Proj 592 - CP3

    • 1453 Words
    • 11 Pages

    Looking at the table above, we can conclude that the project is on budget and may not need much corrective actions. The MS Project predicts that the Budget at completion at $4,453,480, which is a little more than the planned $4,449,920. There might be some cost overruns in the future due to the schedule delay. This could affect the project’s Budget at completion. The current calculation of under budget is misleading the next table (Schedule Performance) shows the project…

    • 1453 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    The Mobot Project

    • 599 Words
    • 3 Pages

    And after some deep thought, we all agreed that the mechanical way would be the…

    • 599 Words
    • 3 Pages
    Good Essays
  • Good Essays

    The organization must focus on requirement analysis instead of deliverable. The deliverable will be of no use if the product or system does not conform to requirements. There should be no costs overrun. Organization must take project scope schedule and cost in account.…

    • 455 Words
    • 2 Pages
    Good Essays