Preview

Construction Contract

Best Essays
Open Document
Open Document
3895 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Construction Contract
ASSIGNMENT
TABLE OF CONTENTS | | PAGE | 1.0 | Is it possible for one standard form of construction contract to meet the need of every project? Discuss by reference to at least two forms in common use in industry. | 2 | 1.0 | What is a Construction Contract? | 2 | 1.1 | Why use a standard form of contract? | 3 | 2.0 | Different forms of contract | 3 | | 2.1 PWD (Public Works Department) FORM OF AGREEMENT | 4 | | 2.2 FIDIC | 4 | 3.0 | Main differences between both forms of contract | 6 | | 3.1 Payments | 7 | | 3.2 Variation | 8 | | 3.3 Extension of time | 9 | | 3.4 Unforeseen ground conditions | 9 | | 3.5 Delays and costs | 10 | 4.0 | The construction industry | 10 | 5.0 | Conclusion | 11 | 6.0 | Reference | 12 |

Is it possible for one standard form of construction contract to meet the need of every project? Discuss by reference to at least two forms in common use in industry.

1. What is a Construction Contract?
A construction contract is a legally binding agreement between two parties under the terms of which one party agrees to perform a specific job for which the other party agrees to pay. This type of contract covers very expensive and complex as well as simple projects. There are two types of clients that use construction contracts namely residential and commercial.
A residential construction contract includes three basic elements. They are project scope, schedule of work and payment details. This type of contract takes place between the property owner who has requested the work and the project manager for the construction company. The project scope is a statement showing all the details of the construction work included in the contract. A schedule of work specifies the start date, milestones, and project completion date. Finally, the payment details section includes the total project cost and payment dates. The basis of payment of all construction projects is based on percentage of completion. At the



References: 1. BEST PRACTICE GUIDELINE #C2 “choosing an appropriate form of contract for engineering and construction works” (September 2005 Second edition of CIDB document 1010) 2 7. Gellert Ivanson Limited, 2009. “Construction Contracts Act 2002” 8 9. F. Tatarestaghi, M. Dr. Zuhairuse Md Darus, M.F.I Irfan Md Nor, 2011. EuroJournals Publishing, Inc. “An Overview of Comparison between Parties of Construction Contracts In Malaysia” 10

You May Also Find These Documents Helpful

  • Satisfactory Essays

    leg 440 discussion week 2

    • 503 Words
    • 3 Pages

    Selection of sources for Architect-Engineer contracts in accordance with the provisions of 40 U.S.C. 1102…

    • 503 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    References: Murphy,J (2009). Guide to Contract Pricing: Cost and Price Analysis for Contractors,Subcontractors,and Government Agencies (5th ed.). Vienna,VA: Management Concepts…

    • 928 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    The GC21 Construction Contract was developed and prepared in conjunction with many organizations. They are:…

    • 2001 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    Request for Proposals

    • 26335 Words
    • 106 Pages

    SECTION 1 2 3 4 5 INTRODUCTION RFP SCHEDULE OF EVENTS PROPOSAL REQUIREMENTS GENERAL REQUIREMENTS & CONTRACTING INFORMATION PROPOSAL EVALUATION & CONTRACT AWARD…

    • 26335 Words
    • 106 Pages
    Powerful Essays
  • Powerful Essays

    PROJ598

    • 2385 Words
    • 11 Pages

    This will be single source negotiated contract. The instructions to the Contractor are provided below.…

    • 2385 Words
    • 11 Pages
    Powerful Essays
  • Better Essays

    Many clients to the construction industry will often face a steep learning curve on their construction project or programme. To establish a valid and robust procurement strategy at the outset is considered a key aspect to achieving a successful outcome to their business or organisation objectives. A significant number of clients come into the category of either being described as occasional or inexperienced. They will rely on their appointed professionals to assist in their selection of the best-suited procurement path.…

    • 3692 Words
    • 22 Pages
    Better Essays
  • Powerful Essays

    Business Law

    • 1897 Words
    • 8 Pages

    I have identified a basic contract that is used when a provider and client have agreed to a specific service and payment for service (Savetz, 2012). The contract is at the end of this paper. In my scenario, the Client has requested the Provider to complete a concrete pad in the back yard of his new home. I will analyze this contract and identify the type of contract used, whether the contract is fair, if the contract is integrated or not, if the contract allows for the assignability of rights, and if the obligator can appoint another party to perform the contractual duties. I have identified the Client as McVay, and the Provider as Thomas. Thomas is the sole owner and employee of the company Concrete 123, in Sacramento California.…

    • 1897 Words
    • 8 Pages
    Powerful Essays
  • Powerful Essays

    Contract Negotiation

    • 1603 Words
    • 7 Pages

    References: Bond, Robert. (2004). Software Contract Agreements Chapter 7: Preparing the contracts.(pp. 171-234). Thorogood Publishing Ltd. Retrieved from EBSCOhost.…

    • 1603 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Contract Pricing

    • 757 Words
    • 3 Pages

    There is a wide selection of contract types available in order to provided needed flexibility in acquiring the large variety and volume of supplies required by the federal government. Contract varies according to the degree and timing of the responsibility assumed by the contractor for the costs of performance and the amount and nature of the incentive offered to the contractor for achieving or exceeding specified standards or goals. The contract types are grouped into two broad categories; one category for fixed-price contracts and the cost-reimbursement contracts.…

    • 757 Words
    • 3 Pages
    Good Essays
  • Better Essays

    AGREEMENT made by and between the Board of Regents, State of Iowa, acting for Iowa State University, hereinafter called the Owner, and { CM Name and Address } hereinafter called the Construction Manager. A strikethrough of paragraph(s) represents deleted or modified language. See Article 16 for deletions, modifications and additions to the Agreement. The Owner intends to undertake on the Campus of Iowa State University a Project entitled: Project Title: { Official Project Title } The Project Design Professional is: { Name of Design Professional } The Owner and Construction Manager agree as set forth below: I. The Construction Manager shall provide services for the Project in accordance with the TERMS AND CONDITIONS OF THE AGREEMENT. The Construction Manager accepts the relationship of trust and confidence established between the Construction Manager and the Owner by this Agreement. The Construction Manager covenants with the Owner to furnish the Construction Manager’s best skill and judgment and to cooperate with the Owner’s Design Professional in furthering the interests of the Owner. The Construction Manager agrees to furnish efficient business administration and superintendence and to use the Construction Manager’s best efforts at all times in the most expeditious and economical manner consistent with the interest of the Owner. II. The Owner shall compensate the Construction Manager in accordance with the TERMS AND CONDITIONS OF THE AGREEMENT. A. For BASIC SERVICES, as described in Article 2, and any other services specified in Article 16 as Basic Services, Compensation shall be computed as follows: For Pre-Construction Phase Services compensation is comprised of costs of personnel engaged in the performance of services provided in this Agreement and directly attributable to the project in accordance with the schedule of Hourly…

    • 10780 Words
    • 44 Pages
    Better Essays
  • Good Essays

    Douglas Wilhelm Harder

    • 978 Words
    • 4 Pages

    There are two types of implied terms: those required by statute (acts of a legislative body) and those…

    • 978 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    a. The purpose of the general conditions is to provide the legal framework for the construction contract and promote fairness among all contracting parties. They detail the rights, responsibilities, and relationships of the owner, contractor and architect or engineer who will be working with both parties throughout construction.…

    • 735 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Quantity Surveying

    • 46501 Words
    • 187 Pages

    Other books by David Chappell Parris's Standard Form of Building Contract Third edition David Chappell 0-632-02195-0 Building Contract Dictionary Third edition David Chappell, Derek Marshall, Vincent Powell-Smith and Simon Cavender 0-632-03964-7 The JCT Intermediate Form of Contract Second edition David Chappell and Vincent Powell-Smith 0-632-03965-5 The JCT Minor Works Form of Contract Third edition David Chappell 1-4051-1523-8 The JCT Design and Build Contract Second edition David Chappell and Vincent Powell-Smith 0-632-04899-9 Building Contract Claims Fourth edition David Chappell, Vincent Powell-Smith and John Sims 1-4051-1763-X Standard Letters in Architectural Practice Third edition David Chappell 1-4051-1556-4…

    • 46501 Words
    • 187 Pages
    Good Essays
  • Powerful Essays

    waterproofing

    • 10215 Words
    • 41 Pages

    • Standardization of construction contracts and • Training manpower at skilled worker level and procedures. construction management level. • Grading of construction entities • Devise mechanisms for workers' welfare. •…

    • 10215 Words
    • 41 Pages
    Powerful Essays
  • Satisfactory Essays

    Public private partnerships or P3 can be the long-awaited solution for the construction industry, developing new strategic alliances, improving public services and reducing government costs. Public private partnerships can be negotiated using different contracting methods producing the projected results allowing a faster benefit to all citizens. Depending on the job being executed Public Private…

    • 483 Words
    • 2 Pages
    Satisfactory Essays