cj industries and heavy pumps
CJ INDUSTRIES AND HEAVEY PUMPS

1. CJI’s issue revolves around their new contract with Great Lakes Pleasure Boats composed of a 5-year, $10 million per year closing deal. After this contract, Great Lakes would represent 30 percent of CJI’s annual sales, and therefore, putting CJI’s and Great Lakes contract on the list of top priorities. CJI produces all their items in house; except for the bilge pump, which is outsourced by Heavey Pumps. Heavey Pumps is a small pump manufacturer that CJI calls whenever they need 50 pumps, which is usually every four to six months. After the Great Lakes contract, CJI will need a 50 pumps every month to provide the job specified on the contract. CJI is not sure Heavey Pumps has the ability to increase their production to meet their demand. Therefore, CJI faces the make or buy analysis.

If they buy, they will be spending an additional $3,000 per year on just shipping alone.

If they make, they will need to investment half a million dollars, hire three additional employees and clear up manufacturing and warehouse space.

Therefore, issue number one is cost, both in buying and making; CJI needs to account for cost. CJI also lacks expertise and time.

Heavey Pumps issue is the capacity to deliver. They will need additional equipment and labor. Also needing to account for other production costs and extra delivery costs.

The last issue is the fact that there are no performance or quality records for Heavey Pumps; therefore, it’s hard to analysis or forecast for such situations.

2. CJI should continue to use Heavey Pumps if they are able to supply 50 pumps per month. They’ve always been able to supply the pumps before CJI’s stock was depleted; therefore, proving their reliability. The advantages would consist of lower shipping and productions costs, and the ability to create an alliance. The disadvantage of a single source is CJI’s dependency on one supplier, making it a risky proposition.

CJI shouldn’t make it

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Wheaton Case

    • 533 Words
    • 3 Pages

    Peak demand request are dealt by Wheaton Sanitary District by keeping recourses at their most elevated levels for both equipment and man-power. They have four screw pumps, which work autonomously. In any case, in the midst of top season each of the four could be in operation.…

    • 533 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Computer-Image’s proposal comes with a contract of 3 years which can be cancelled but with a 45 day warning before cancelling however by not outsourcing they will not need any kind of legal contract because everything done in the firm is internal. The cost with them will be $265 cheaper than the cost per chasses with insourcing, it would only cost $225 compared to $490. The number of chasses that can be produced per year is also more favorable with their outsourcing option. They can get from a minimum of 1000 chasses to 2500 maximum which is perfect considering that they expect a demand for 1250 and they can still keep expanding their market share to double in the time that this contract is valid however they cannot drop below 1250 chasses. Internally they do not have a minimum limit and maximum of 2000 which they can’t exceed which limits growth more than their outsourcing option, and adding that minimum could motivate the employees to reach higher targets and result in growth. The cost for Computer Image to do the designing is higher than TFC’s by $100,000 because it will be $300,000 but this is an extra cost that’s worth paying since this company is a professional company and there will be less room for error and with them doing it TFC’s employees can focus on meeting the higher demand and providing better customer service. This company will also be using advanced technology…

    • 543 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Fe'Nix Del Sur Case

    • 860 Words
    • 4 Pages

    by tripling its replica production in order to potentially add $4 million in additional sales.…

    • 860 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    Waltham Motors Division

    • 647 Words
    • 3 Pages

    Total Expected cost per Unit = $42.93 Total actual cost per Unit=$49.51 Per unit actual shipping cost= $2…

    • 647 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    There are many different types of heavy-duty industrial trucks in use today, some of which have come from the simplest ideas, offering solutions to even difficult work issues. Such is the case with pumper or tanker trucks; they offer an efficient and safe way to transport most liquids, from clear pool water to caustic chemicals. Despite such a simplistic concept, pumper trucks are available in many different types and with different uses in mind. So it is important to examine the different types to be sure the right one is added to the work fleet.…

    • 458 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Muenenster Pup Essay

    • 711 Words
    • 3 Pages

    Muenster Pump currently manufacturer’s a case pump housing at a cost twice that of their competition. The company must decide whether or not to continue to manufacture in-house, or to outsource and buy the product from another company. Considerations such as quality, delivery, customer relations, cost, and volume of orders must be taken into account.…

    • 711 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Stryker Corporation Case

    • 650 Words
    • 3 Pages

    The case contemplates the projected comparison from 2004 to 2009 of the costs of buying PCBs from an external supplier and the costs of making the PCBs. What we will analyze is the positive cash flow that is derived from the cost improvement of making the PCBs compared to outsourcing them. The sum of these annual savings should be a positive cash flow for the company via a cost reduction.…

    • 650 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Hmc Essay

    • 1065 Words
    • 5 Pages

    $16,500,000, which accounts for 90% of annual capacity as of August 31. If they can’t fill these orders by the…

    • 1065 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Jenny Wilson is a buyer at Flextron, a manufacturer of large industrial pumps. She has a…

    • 834 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Clayton Industries

    • 470 Words
    • 2 Pages

    a. Early cost estimates were about 5 million with the most of that investment in the next 12 months.…

    • 470 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Wilkerson Company

    • 1390 Words
    • 6 Pages

    The competitive situation varies for Wilkerson’s products. Pump and flow controllers are on theopposite sides of the spectrum. Pumps are commodity products, produced in high volumes for amarket with severe price competition. Flow controllers, on the contrary, are customized products,sold in a less…

    • 1390 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    Wisner Case Study

    • 1080 Words
    • 5 Pages

    In October 2007, CJ Industries (CJI) had just been awarded a 5-year contract with Great Lakes Pleasure Boats amounting to U.S. $10 million per year, commencing in July 2008. CJI would be providing a number of key engine components for Great Lakes’ luxury line of pleasure boats. The award marked an important milestone for CJI, in that it was the culmination of several years of hard work and dedicated service, supplying Great Lakes parts for their boats on an as-needed basis. The contract had significant longterm follow-on potential as well, if they could continue to show Great Lakes they had the capabilities to be one of their valued, alliance partners. In addition, with this contract Great Lakes would represent approximately 30 percent of CJI’s annual sales, so performing adequately on this contract had a significant long-term financial impact on CJI. One of the parts, a bilge pump, was an item that CJI had been purchasing from one of their suppliers, Heavey Pumps, a small local specialty pump manufacturer, on an informal, non-contract basis. The remaining items were all built in-house by CJI and supplied to Great Lakes from one of their two finished goods warehouses located near the Great Lakes production facilities. Heavey Pumps was producing and delivering 50 bilge pumps at a time at a cost of U.S. $1500 per unit and built to Great Lakes’ specifications, to one of the CJI warehouses, whenever an order was telephoned in by CJI. The…

    • 1080 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    Wilkerson Case Study1

    • 1513 Words
    • 9 Pages

    2. High-volume pumps- quickly became a major supplier of pumps; they manufacture and spend more machine hours on producing this product…

    • 1513 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    The Company is producing 3 major products – Valve, Pump and Flow Controller. The Company is concerned about the price cutting of Pumps going on in the market every month. It is also surprised to see no change in sales of Flow Controller despite 12 ½% increases in prices.…

    • 338 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Electrical Submersible Pump

    • 7786 Words
    • 32 Pages

    Case Services’ software provides production optimization for a variety of different methods of artificial lift. This paper discusses the dominant factors in electrical centrifugal submersible pump design and monitoring. Emphasis is placed on three areas: • • • Well inflow performance behavior. Fluid Pressure-Volume-Temperature and phase behavior. Pump equipment performance specifications.…

    • 7786 Words
    • 32 Pages
    Better Essays