Assignment Ch05
Assignment Materials

5-15
Revising a time-driven activity-based cost system, adding products Refer to the Madison Dairy ice cream plant example described in this chapter.
Required
(a) Suppose that production-related computer resource expenses of $18,000 per month have been inadvertently overlooked for inclusion in the cost system. Explain how the time-driven ABC model should be updated to reflect this cost.
Answer:
Time-driven activity-based costing systems (TDABC or Time-Driven ABC) estimate two parameters and then assign indirect costs similar to the way direct costs are assigned.
Cost rate for each type of indirect resource
Identify all costs incurred to supply the resource
Identify the practical capacity supplied by the resource
Determine the capacity cost rate of the resource by dividing its cost by the practical capacity
The time-driven ABC model will now include a capacity cost rate for computer resources
= $18,000 divided by the practical capacity computer hours per month.
The computer resources Usage can measure in computer time per product or production run.
(b) Suppose that energy costs of $4,000 per month to run the machinery have also been inadvertently overlooked for inclusion in the cost system. How should the activity-based cost model be updated to include this cost, and what will be the effect on the machine hour rate?
Answer:
Before the machinery energy costs were calculated
It was:
The machinery rate was computed as $15,400 divided by 308 practical capacity hours, which equals $50 per hour. The energy costs of $4,000 per month will be added to the $15,400 monthly machinery costs,
The Correct machinery resource cost of $19,400 per month, leading to a higher rate per hour. The new rate is $19,400/308 = $62.99, which can be rounded to $63 per hour for convenience.

(c) If the company wishes to introduce a new flavor, what information is needed in order to determine the cost of producing this new flavor?
Answer:

If the company introduces a

You May Also Find These Documents Helpful

  • Powerful Essays

    Activity Based Costing Method (ABC). ABC determines and allocates cost by activities a company executes. This generally happens in four steps: identify each activity and its associated costs, both total and indirect; estimated cost driver and quantity; allocation computation; and cost allocation to the respective activity. ABC refines the way indirect costs are allocated to production and focuses on the costs of each individual activity. Costs are also further assigned to each product within the activities and each activity has its own cost driver. Because of the specificity, active based costing provides a…

    • 1900 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    Econ 247

    • 1525 Words
    • 11 Pages

    1. Suppose that a firm has fixed costs of $25 per day for renting one machine and its variable costs are as shown in the table below.…

    • 1525 Words
    • 11 Pages
    Satisfactory Essays
  • Better Essays

    Jet2 Task 4

    • 2238 Words
    • 9 Pages

    The main difference between activity based costing and the traditional system is that activity based costing requires four steps to build its cost point. Traditional costing uses one rate where first, activity based costing must identify each activity and estimate its total and indirect cost. Second for activity based costing is that the cost driver for each activity must be estimated along with the total quantity of each driver’s allocation base. Third the cost allocation for each activity must be computed. Fourth costs to cost object are allocated. Activity-based costing focuses on activities. The costs of those activities become the building blocks for measuring (allocating) the costs of products and services. (Horngren, Harrison, Jr & Oliver, 2008) This method of costing does require more time to compute the cost to the activity yet it earns that money back plus dividends by having a more accurate forecast of the true costs that are associated with each activity.…

    • 2238 Words
    • 9 Pages
    Better Essays
  • Powerful Essays

    South Dakota Microbrewery

    • 1045 Words
    • 5 Pages

    Both a plant-wide allocation system and activity based costing have their own unique advantages and disadvantages. Due to the simpler, less time consuming process, allocating based on direct-labor hours is much cheaper because the company does not have to pay someone to do the additional math required by the activity based costing method. However, activity based costing is more accurate because the costs incurred by South Dakota Microbrewery do not all share a singular cost driver and are better represented by allocating each cost to their own driver.…

    • 1045 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    AC202 Ch17

    • 273 Words
    • 2 Pages

    The traditional costing system of assigning overhead cost is only an estimated number used from values/information gathered from the prior year(s). Using the activity-based costing system in addition to the estimated number, the formula also puts into account any cost drivers that may drive up (or down) the cost. The overhead cost using this method is related to an activity.…

    • 273 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Assignment 1.1

    • 522 Words
    • 3 Pages

    10 How is the relevant range of activity related to fix and variable cost? Give an example of how the definitions of these costs become invalid when volume is outside the relevant range.…

    • 522 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Managerial Accounting

    • 779 Words
    • 3 Pages

    Activity-based costing involves two allocation stages and includes a multitude of cost drivers. The ABC assigns costs to pools; and during the second stage the cost pools are allocated to products or cost objects by utilizing cost drivers that measure the object’s use of that activity. This activity based management helps identify costs, while just-in-time-inventory seeks to eliminate the non-value added activity by reducing inventory holdings and removing the activities associated with their maintenance. The just-in-time systems inventory is made available just in time for customer consumption.…

    • 779 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    MD Widgets manufactures three different product lines, Model X, Model Y, and Model Z. Considerable market demand exists for all models. The following per unit data apply:…

    • 379 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    |C. |Estimate the total electricity cost to be incurred in December if 5,300 machine hours are incurred. |…

    • 1953 Words
    • 8 Pages
    Satisfactory Essays
  • Powerful Essays

    Chaper 5 Study Guide

    • 11148 Words
    • 45 Pages

    If the usage of project activities is not proportional to the number of units produced, then some managers…

    • 11148 Words
    • 45 Pages
    Powerful Essays
  • Satisfactory Essays

    ACTG Assignment 1

    • 255 Words
    • 2 Pages

    Estimated Overhead Cost Expected Activity Predetermined Overhead Rate = $606,000 120,000 DLH Predetermined Overhead Rate = $5.05/DLH b) Direct Labour Rate = Direct Labour Wages Hours Used Direct Labour Rate = $51,000 (3,500 + 3,000 + 2,000) DLH Direct Labour Rate = $6/DLH Job X-50 Beg. DM $54,000 Nov. DM $45,000 Nov. DL $21,000 Nov. OH $17,675 Total $137,675 DL = 3,500 DLH x $6/DLH DL = $21,000 OH = 3,500 DLH x $5.05/DLH OH = $17,675 Job X-51 Nov. DM $37,500 Nov. DL $18,000 Nov. OH $ 15,150…

    • 255 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    4. Develop and diagram an activity-based cost (ABC) model using the information in the case.…

    • 585 Words
    • 3 Pages
    Good Essays
  • Good Essays

    | (a) Direct labor dollars 776000/17500 x 10 = 443.43% (b) Direct labor hours 776000/17500 =$44.34 per hour (c) Machine hours 776000/105000 = $7.39 per machine hour…

    • 5979 Words
    • 24 Pages
    Good Essays
  • Satisfactory Essays

    Activity-Based Costing

    • 627 Words
    • 3 Pages

    Activity-Based Costing (ABC) is when you figure out the cost of activities to then discover the cost of products and services. ABC occurs in in four stages. These steps are as follows: identify activities and calculate their estimated total costs, identify the allocation base for each activity and estimate the total quantity of each allocation base, compute the predetermined overhead allocation rate for every activity, and allocate indirect costs to the cost object. I will use the production of a shirt to explain the process of ABC. Manufacturing a shirt requires three activities: setup, production, and shipping/packaging. In the setup stage, the machines are weaved with the proper thread, and oiled down, which allows the shirts to then be manufactured. After production, the shirts are packaged and shipped out. The estimated overhead cost for setup in the next year is $10,000 for setup, $25,000 for production, and $15,000 for packaging/shipping. In the next step, we give allocating bases to each. The allocation base for the setup stage is number of thread bobs used to produce 100 shirts, which is 10 thread bobs. The allocation base for production is the number of shirts that can be produced in an hour (500). The allocation base for…

    • 627 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Costing Systems

    • 8321 Words
    • 34 Pages

    MULTIPLE CHOICE QUESTIONS 1. Consider the following statements regarding traditional costing systems: I.Overhead costs are applied to products on the basis of volume-related measures. II.All manufacturing costs are easily traceable to the goods produced. III.Traditional costing systems tend to distort unit manufacturing costs when numerous goods are made that have widely varying production requirements. Which of the above statements is (are) true? A. I only. B. II only. C. III only. D. I and III. E. II and III. Answer: D LO: 1 Type: N 2. Many traditional costing systems: A. trace manufacturing overhead to individual activities and require the development of numerous activity-costing rates. B. write off manufacturing overhead as an expense of the current period. C. combine widely varying elements of overhead into a single cost pool. D. use a host of different cost drivers (e.g., number of production setups, inspection hours, orders processed) to improve the accuracy of product costing. E. produce results far superior to those achieved with activity-based costing. Answer: C LO: 1 Type: N 3. The following tasks are associated with an activity-based costing system: 1—Calculation of cost application rates 2—Identification of cost drivers 3—Assignment of cost to products 4—Identification of cost pools Which of the following choices correctly expresses the proper order of the preceding tasks? A. 1, 2, 3, 4. B. 2, 4, 1, 3. C. 3, 4, 2, 1. D. 4, 2, 1, 3. E. 4, 2, 3, 1. Answer: D LO: 2, 4 Type: RC…

    • 8321 Words
    • 34 Pages
    Powerful Essays

Related Topics