Preview

Analytics Exercise II: Designing a Manufacturing Process

Satisfactory Essays
Open Document
Open Document
593 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Analytics Exercise II: Designing a Manufacturing Process
Business in the 21st Century – MBA 8250

Analytics Exercise II
What is the daily capacity of the assembly line designed by the engineers? Assume that the assembly line has a computer at every position when it is started at the beginning of the day. Assuming the assembly line has a computer at every position when it started at the beginning of the day, the daily capacity would be 225 units per day (30 units/7.5 hours). The line is operating at 7.5 hours per day and 9th workstation seems to be the jam-up is occurring which in turn limits the cycle time to 2 minutes.
When it is running at maximum capacity, what is the efficiency of the line relative to its use of labor? Assume that the supporter is not included in efficiency calculations. The sum of the task times is 583 seconds. To figure this out, I used the efficiently calculation of only including tasks performed at the work stations using labor and omitted the 310 seconds of software download. Efficiency = work content/(actual number of workstations X cycle time) = 583/6(120) = 80.97%
How should the line be redesigned to operate at the initial 250 units per day target, assuming that no overtime will be used? What is the efficiency of your new design? The cycle time will have to be reduced if overtime will not be used. To come up with the more idealistic cycle time I calculated: cycle time = production time per day/required output per day = 7.5 x 60 x60/250 = 108 seconds/unit. Almost every workstation is below the cycle time except for workstation 6 which is assembly line position number 9. To meet the new cycle time, I believe tasks 16 and 17 need to be split. I recommend moving task 17 into assembly line number 10 to accommodate the new cycle time and adding an additional worker on the line.

What about running the line at 300 units per day? If overtime were used with the engineers' initial design, how much time would the line need to be run each day? If they were running about 300 units per day, using

You May Also Find These Documents Helpful

  • Good Essays

    Operations Managements

    • 2532 Words
    • 11 Pages

    Consider a firm with a daily demand of 100 units, a production rate per day of 500 units, a setup cost of $200, and an annual holding cost per unit of $10. Suppose that the firm operates 300 days per year. How many units of inventory must their storage area be able to hold?…

    • 2532 Words
    • 11 Pages
    Good Essays
  • Good Essays

    WGU JGT Task #1

    • 1134 Words
    • 5 Pages

    Catherine Pang provided the assembly schedule which denotes cycle time which is the maximum amount of time the boot is allowed to spend at each workstation. Upon initial inspection of the workflow, it is noted that a “bottleneck” is noted due to a variance between stations B and C (with a three minute difference) and stations E and F (with one minute difference). Both variances in sequential steps cause…

    • 1134 Words
    • 5 Pages
    Good Essays
  • Good Essays

    MgtOp 340 Final Exam Notes

    • 5984 Words
    • 33 Pages

    p=(250,000/250days)=1,000 P=250,000(production rate) d=800 D=(800*250days)=200,000 S=$40 I=.25 c=$30 H=(.25*30)=7.5 Optimal batch size => sqrt([2DS/H(1-d/p)] = 3266…

    • 5984 Words
    • 33 Pages
    Good Essays
  • Satisfactory Essays

    Bus 630 Case Study

    • 392 Words
    • 2 Pages

    2) A department works one 8-hour shift, 250 days per year. It has demand for the following products. How many pieces of equipment are needed to meet the demand?…

    • 392 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    JGT2 ALL

    • 10845 Words
    • 44 Pages

    The current workflow needs to address how to best organize the assembly line so that it is most efficient,…

    • 10845 Words
    • 44 Pages
    Better Essays
  • Powerful Essays

    Dermaplus Analysis

    • 1521 Words
    • 7 Pages

    Refer to Appendix I for the detailed calculations for profit-maximizing average daily production capacity and expected…

    • 1521 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Littlefield Case Study

    • 875 Words
    • 4 Pages

    At this point, our team should have reevaluated our decisions, and purchased a new machine for Station 1, in order to get production moving faster to Station 2. As our utilization was remaining at a constant 100%, our lead times were also increasing. With full utilization, we were unable to produce enough product to meet our order demands, further increasing the queues at each station and increasing our lead times (as shown).…

    • 875 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Find an option that would be best suited for Pharma to meet current and future demand.…

    • 717 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    This is done by adding a 4th dryer, a capital investment of $40,000 that brings the capacity of the dryer operation to 800 barrels per hour. In doing so, the process has the ability to handle all capacity of product in just over 14 hours. This equates to roughly 6 hours of overtime for processing. At the same time, we are suggesting that the plant begins processing at 7am, rather than 11am. This completely eliminates any bin backup and the need for trucks to hold barrels while creating a waiting line. The 7am start time causes no added expense or need for extra overtime. With our suggestions implemented, receiving employees are now only there for roughly 5.3 hours of overtime till just after 8pm. Processing employees are only now working 6.3 hours of overtime till just after 9pm. Total overtime payroll is now $2,463 daily, reducing the cost for the 20 day period to $49,266. See Figure 2 for these…

    • 944 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Com Prob 5

    • 716 Words
    • 6 Pages

    This problem covers various topics from Chapters 15 through 21. The emphasis is on job…

    • 716 Words
    • 6 Pages
    Satisfactory Essays
  • Satisfactory Essays

    4. On average, how long will the trucks have to wait on a busy day? Assume a 7am start of processing of berries.…

    • 426 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Ilm Work Based Assignment

    • 2096 Words
    • 9 Pages

    Line 2 mass produces cases of canned beverages of all varieties and has the ability to produce 120,000 cans/hour which calculates to be over 33 cans/second. From that it is clear to see that every second lost because of un-planned stoppages will decrease our line utilization which is a loss of sales revenue.…

    • 2096 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Husky Injection

    • 233 Words
    • 1 Page

    According to the information in this case (exhibit #6), Husky charges for its product 200,000$ higher relatively to competitor’s product. For answering this question, whether the premium above is justified from the customer’s point of view, the following calculation will be made:…

    • 233 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    There have been recent losses experienced by CBF, due to the system that is currently in place. The policy has changed and all orders placed now are being increased by 25%. The policy now places stress on the running system. On a highly-productive day, the plant produces 700 circuit boards, but "was designed to run 1,000 boards per day when running five days a week and one eight-hour shift per day." CBF has hired a consultant to discuss the reasons why they are not able to produce 1,000 boards per day as created. The following analysis will address the process flow structure, the capacity of the process, losses of the process, short and long-term recommendations for improvement opportunities.…

    • 1197 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Wescott case study

    • 475 Words
    • 11 Pages

    According to the results, Model A has an overtime work of 2.75 hours if the standard working hours 8 hours. Same goes to Model B & C, both model worked for 2.77 if the standard working hours 8 hours. However, the production in Model D & E are overrun to 2.5 and 3 days which is insufficient.…

    • 475 Words
    • 11 Pages
    Satisfactory Essays