Preview

Activity Based Costing - Definition and Concept

Powerful Essays
Open Document
Open Document
1476 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Activity Based Costing - Definition and Concept
Activity based costing
Definition and concept
‘An approach to the costing and monitoring of activities which involves tracing resource consumption and costing final outputs. Resources are assigned to activities, and activities to cost objects based on consumption estimates. The latter utilise cost drivers to attach activity costs to outputs.’
Activity-based costing (ABC) is a costing methodology that identifies activities in an organization and assigns the cost of each activity with resources to all products and services according to the actual consumption by each. This model assigns more indirect costs(overhead) into direct costs compared to conventional costing.
CIMA Official Terminology, 2005
A development of the principles of activity based costing (ABC) is activity based management (ABM).
Operational ABM is defined as:
‘Actions, based on activity driver analysis, that increase efficiency, lower costs and/or improve asset utilisation.’
CIMA Official Terminology, 2005
Strategic ABM is defined as:‘Actions, based on activity based cost analysis, that aim to change the demand for activities so as to improve profitability.’
CIMA Official Terminology, 2005
The main focus of this topic gateway is ABC. However, the development of ABC into ABM will be discussed further under Application.
The concept of ABC was first defined in the late 1980s by Robert Kaplan and William Burns. Initially ABC focused on manufacturing industry where technological developments and productivity improvements had reduced the proportion of direct labour and material costs, but increased the proportion of indirect or overhead costs.

Comparison of traditional costing and ABC
The traditional method of costing relied on the arbitrary addition of a proportion of overhead costs on to direct costs to attain a total product cost. The traditional approach to cost allocation relies on three basic steps.
1. Accumulate costs within a production or non-production department.
2.

You May Also Find These Documents Helpful

  • Powerful Essays

    Activity Based Costing Method (ABC). ABC determines and allocates cost by activities a company executes. This generally happens in four steps: identify each activity and its associated costs, both total and indirect; estimated cost driver and quantity; allocation computation; and cost allocation to the respective activity. ABC refines the way indirect costs are allocated to production and focuses on the costs of each individual activity. Costs are also further assigned to each product within the activities and each activity has its own cost driver. Because of the specificity, active based costing provides a…

    • 1900 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    Jet2 Task 4

    • 2238 Words
    • 9 Pages

    The main difference between activity based costing and the traditional system is that activity based costing requires four steps to build its cost point. Traditional costing uses one rate where first, activity based costing must identify each activity and estimate its total and indirect cost. Second for activity based costing is that the cost driver for each activity must be estimated along with the total quantity of each driver’s allocation base. Third the cost allocation for each activity must be computed. Fourth costs to cost object are allocated. Activity-based costing focuses on activities. The costs of those activities become the building blocks for measuring (allocating) the costs of products and services. (Horngren, Harrison, Jr & Oliver, 2008) This method of costing does require more time to compute the cost to the activity yet it earns that money back plus dividends by having a more accurate forecast of the true costs that are associated with each activity.…

    • 2238 Words
    • 9 Pages
    Better Essays
  • Satisfactory Essays

    D: Whenever a costing system is used, it should identify the various activities at a corporation and use multiple cost drivers to assign overhead costs and indirect costs to products. ABC improves the accuracy when compared to traditional costing systems, such as the one CarryAll used. It gives a better understanding of overhead. ABC utilizes unit cost rather than just total cost. If CarryAll’s president is interested in understanding why ABC is important, he needs to look at the Operating Profit because it looks at all activities versus looking at…

    • 303 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Case 5A

    • 1200 Words
    • 5 Pages

    Next, management must identify the big overhead cost in order to determine whether or not they want to allocate some or a bunch of overhead using the activity-based costing system. I suggest that Glaser creates an activity-based costing system that allocates, with a minimal amount of effort, a large portion of their overhead. For instance, management is correct in…

    • 1200 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    AC202 Ch17

    • 273 Words
    • 2 Pages

    The traditional costing system of assigning overhead cost is only an estimated number used from values/information gathered from the prior year(s). Using the activity-based costing system in addition to the estimated number, the formula also puts into account any cost drivers that may drive up (or down) the cost. The overhead cost using this method is related to an activity.…

    • 273 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Global Electronics

    • 1507 Words
    • 7 Pages

    This case analyses the ABC and ABM implementation process at Global Electronics Inc (GEI). GEI has been using a traditional costing system which allocates manufacturing overhead costs based on direct labour hours, which is about 10% of total cost. This costing system resulted in operating losses o $100 million although sales have been $650 million. As a result, it was believed that GEI’s costing system is not accurate.…

    • 1507 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Managerial Accounting

    • 779 Words
    • 3 Pages

    Activity-based costing involves two allocation stages and includes a multitude of cost drivers. The first stage known as ABC assigns costs to pools; which signify the activities of the costs to be incurred. During the second stage the cost pools are allocated to products or cost objects by utilizing cost drivers that measure the object’s use of that activity.…

    • 779 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Abc Company - 1

    • 1244 Words
    • 5 Pages

    3) The McGraw-Hill Companies, Inc., Chapter 9: Activity-Based Costing, csus.edu, 2011, pdf. Retrieved 18 December 2012 from http://www.csus.edu/indiv/p/pforsichh/documents/ACCY121FinalExamInstrManualchs9_11_13_16_Appendix.pdf…

    • 1244 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Chaper 5 Study Guide

    • 11148 Words
    • 45 Pages

    If the usage of project activities is not proportional to the number of units produced, then some managers…

    • 11148 Words
    • 45 Pages
    Powerful Essays
  • Good Essays

    In activity based costing (ABC), an activity cost driver is something that drives the cost of a particular activity. A factory, for example, may have running machinery as an activity. The activity cost driver associated with running the machinery could be machine operating hours, which would drive the costs of labor, maintenance and power consumption of running the machinery activity.…

    • 462 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Activity based costing (ABC) assigns manufacturing overhead costs to products in a more logical manner than the traditional approach of simply allocating costs on the basis of machine hours. Activity based costing first assigns costs to the activities that are the real cause of the overhead. It then assigns the cost of those activities only to the products that are actually demanding the activities.…

    • 1474 Words
    • 6 Pages
    Powerful Essays
  • Better Essays

    Cost Method Paper

    • 1000 Words
    • 4 Pages

    The management of Super Bakery thought it was necessary to implement the activities of the ABC cost method. The concept of the method is to produce a costing system that a company allocates factory overhead costs to activity center (e.g. bakery machine set ups, operating machines) and then uses activity cost drivers to allocate factory overhead costs to individual products or services. Http://simplestudies.com/activity-based-costing_(abc).html…

    • 1000 Words
    • 4 Pages
    Better Essays
  • Satisfactory Essays

    Use the Internet or other credible resources to find an article relevant to activity-based costing (ABC), job costing, or process costing. Prepare a 125-word summary of the article. Briefly summarize the major topics of the article, and explain what you learned as a result of your reading. Be sure to properly cite the article in your summary and be prepared to present your summary to the entire class.…

    • 414 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    What is activity-based costing? What are some of the key elements of activity-based costing? How does this method differ from a more traditional costing method?…

    • 511 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Activity Based Management

    • 759 Words
    • 4 Pages

    The battle to sustain and increase corporate profitability grows ever more arduous in most sectors of the economy. Margins are caught in a pincer movement by both the steady improvement in competition, and the increasing awareness of customers. We need to grasp every opportunity not only to be ever more effective at what we do, but also to be truly competitive, winning more market share(both nationally and globally). Thus Activity Based Management (ABM) was introduced to enable managers to understand and improve the product profitability, customer profitability & the cost of the business processes. ABM includes cost driver analysis, activity analysis, and performance measurement.…

    • 759 Words
    • 4 Pages
    Good Essays