Achieving Project Goals Simulation 3
Running head: ACHIEVING PROJECT GOALS SIMULATION

Achieving Project Goals Simulation
Lisa Marion
University of Phoenix

Project Management
MGT437
Mark Vertin
January 7, 2009

Achieving Project Goals Simulation The Work Breakdown Structure (WBS) contains the different activities within a project. Every activity necessitates outputs from several experts following different measures and timelines. The total of these activities represent the end deliverable. In order to control the task effectively the project supervisor must track the logical order of the various parts. He must visualize the final project deliverable. Views regarding project management, benefits and restrictions, bottlenecks, changes to risk or time in a crisis, and four points touched.
History
The Huduma Foundation is a Non-Governmental Organization (NGO). The foundation is devoted to rescuing and rehabilitating untamed animals in the national parks of Kandivar. Random poaching created an imbalance of wild animals in specific national parks in the country. Animal Rights Activist formed the Hunduma Foundation five years ago in the state of Ungoba. The organization believes that they can stop the disproportion of animals with planned methods. The Huduma Foundation has defined the project scope and deliverables of Operation Elephants’ Ark. The operation consists of the relocation of elephants from Zakinaka National Park to Ungoba National Park. The information is then delivered to the Executive Director of Ungoba National Park. The major task prior to starting the project is to identify the order of activities in the Work Breakdown Structure (WBS) of the project. The sequence of activities is to: • Locate the herd of elephants, tranquillize them, and wet them down. • Attach GPS tracking collars, conduct a medical exam, and strap them. • Lift them, load elephants onto the recovery truck, and administer sedatives. • Back the



References: Kerzner, H. (2006). Project Management: A Systems Approach to Planning, Scheduling and Controlling Retrieved December 21, 2008, from https://ecampus.phoenix.edu/content/eBookLibrary/content/eReader.h University of Phoenix. (2008). Achieving Project Goals Simulation [Computer Software]. Retrieved December 22, 2008, from University of Phoenix, Simulation, MGT437 - Project Management.

You May Also Find These Documents Helpful

  • Good Essays

    Huntsville Plant

    • 654 Words
    • 3 Pages

    “Creating a WBS is a structured approach for organizing all the project work and deliverables into logical groupings and subdividing them into more manageable components to help ensure that all the work and deliverables to complete the project are identified and included in the baseline project plan. It is a hierarchical tree of deliverables or end items that will be accomplished or produced by the project team or contractor during the project. “…

    • 654 Words
    • 3 Pages
    Good Essays
  • Better Essays

    Pm Ch. 13 Notes

    • 4461 Words
    • 18 Pages

    1. Setting a goal. Project goal setting goes beyond overall scope development to include setting the project baseline plan. The project baseline is predicated on an accurate. Work Breakdown Structure (WBS) process. Remember that WBS establishes all the deliverables and work packages associated with the project, assigns the personnel responsible for them, and creates a visual chart of the project from highest level down through the basic task and subtask levels. The project baseline is created as each task is laid out on a network diagram and resources and time durations are assigned to it.…

    • 4461 Words
    • 18 Pages
    Better Essays
  • Powerful Essays

    Pm592 Course Project 2

    • 3890 Words
    • 16 Pages

    Given the scope of the project by the customer, we took the information and formatted it into a WBS (Work Breakdown Structure) and presented it back for customer buy-in. We developed the WBS using Microsoft Project, breaking it down into more manageable packages and into separate activities to better manage.…

    • 3890 Words
    • 16 Pages
    Powerful Essays
  • Satisfactory Essays

    The number of elephants and rhinos are declining in nations where animals are housed on national parks and rising in nations where the animals are privately owned and farmed by individuals due to property rights and private goods. Most nations where elephants and rhinos are housed on national parks a common ownership has been established by the government and the responsibility for these animals is not individualized by any one person, thus, the proper care that is needed is not delivered. However, in nations where individuals are allowed to own elephants and rhinos, responsibility is clear and maintenance is adhered. Nations were there are individual owners the stakes for healthy animals are much higher and necessary.…

    • 341 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Elephant Helping Trunk

    • 528 Words
    • 3 Pages

    Elephants are intelligent, gifted, and exquisite mammals that can figure out tasks by themselves or cooperatively. In the article “Elephants Can Lend a Helping Trunk”, the passage “Elephants Know When They Need a Helping Trunk in a Cooperative Task”, and the video “Elephants Show Cooperation”, the sources all argue that elephants are very shrewd animals that are capable of completing tasks. All of the sources say that elephants are considered to be cooperative, clever, prudent, and more.…

    • 528 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Project Manegement

    • 252 Words
    • 2 Pages

    The work breakdown structure (WBS) is a tool in project management because it offers the basis for deciding on how to do the work.…

    • 252 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Management

    • 2874 Words
    • 12 Pages

    Project Conveyor Belt Memorandum Subject: Conveyor Belt Project Part 1 Memo Work Breakdown Structure (WBS) Information Identify Project Milestone. WBS information assists us to identify project’s milestones. A WBS is developed to confirm job to be done which this will assist us to establish project’s milestones.…

    • 2874 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    The name of the magazine in which the article, “Fighting for Elephants” is located is …

    • 567 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    MGT Task1 v2

    • 1065 Words
    • 9 Pages

    Work Breakdown Structure: This section explains building out of WBS Dictionary which communicates decomposition of deliverables into task, process, and assigns a team lead responsible for each phase. This dictionary explains work item definitions, work item sequencing, labor resource assignments for each work item, work item durations and deliverables.…

    • 1065 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    I am a senior project manager at Delphi Printers & Peripherals, a small electronics and computer peripheral manufacturer based in Santa Clara, California. I have been tasked with assembling and directing a product design team to develop a new and innovative consumer printer. Delphi has intelligence suggesting that a competitor is launching a printer with similar features and capabilities in 6 months, putting pressure on me and my team to develop a new printer that can compete effectively against the competitor's offering.…

    • 461 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Poultry Industry Projects

    • 678 Words
    • 3 Pages

    One of the main tools used in these projects is the work break down structure (WBS). This tool allows the team to know what operations are going on at any given moment. A work breakdown structure is a key project deliverable that organizes the team 's work into manageable sections. The Project…

    • 678 Words
    • 3 Pages
    Good Essays
  • Best Essays

    ITM305 - Previous Exam

    • 2426 Words
    • 10 Pages

    A work breakdown structure (WBS) is simply a list of all the required individual activities and tasks for the project.…

    • 2426 Words
    • 10 Pages
    Best Essays
  • Best Essays

    business report

    • 2508 Words
    • 11 Pages

    Globerson, S. (1994) ‘Impact of various work-breakdown structures on project conceptualization,’ International journal of project management, 12(3), pp. 165-171…

    • 2508 Words
    • 11 Pages
    Best Essays
  • Better Essays

    My dissertation will improve these limitations by looking at HEC at the landscape-scale strategies with the inclusion of all stakeholders, such as rural community, park ranger, and tourism agency , to the planning process. Then this thesis project would like to contribute to framework development through landscape planning research for human-elephant conflict resolution. Landscape planning is a holistic view of the forest as elephant habitat and food resources. Landscape planning research will approach the HEC by focusing on the interrelationship between elephant and forest (IEF). The focus on this interaction will allow 1) to identify the nutritional quality of foods around bais and fruiting that forest elephants consume across seasons; 2) to understand forest elephants movements between these sites without human pressure such as poaching or logging activities. This knowledge will be combined with rural community knowledge and scientific based study to improve elephants’ hotspots, which are bais or area around fruiting trees. The sought objective is to reduce elephant crop raiding. Through landscape strategy, criteria will be defined with stakeholders' contribution to identifying hotspots that could be surcharged with food resource , particularly the most nutritious foods, to create a hub for elephant. The hub will be a network of improved hotspots, which should suite…

    • 976 Words
    • 4 Pages
    Better Essays
  • Satisfactory Essays

    Digital Library Project

    • 701 Words
    • 3 Pages

    We start on project scheduling by defining tasks and subtasks and estimating the duration and dependencies of each task. The Work Breakdown Structure (WBS) is as shown as in Table 9.1 below. Referring to this WBS we manage to create a Gantt Chart which shows the project schedule in it’s timeline. We also generate the Network Diagram and identify critical path, to make sure we are more concern on certain critical tasks. In order to divide the tasks between members, we produce a staffing relocation diagram. Although each member is allocated with different tasks, knowing other members’ tasks is a must because in this project we need to understand the entire process in order to deliver a good result.…

    • 701 Words
    • 3 Pages
    Satisfactory Essays